Converteam to Perform Upgrade for CCG

Tuesday, July 25, 2006
Converteam was awarded a contract from the federal Government of Canada to provide mid-life electrical system upgrade services to the Canadian Coast Guard icebreaker, Sir Wilfrid Laurier. The scope $2.65m contract includes three main elements: upgrade the existing propulsion system; supply a new bow thruster system; and supply new drive systems and motors for the existing cranes. Converteam will design, manufacture, supply, and warrant the complete equipment sets, as well as provide an operator training program for each system. Additional services to be provided include assisting the shipyard during initial equipment installation, equipment commissioning and testing, plus sea trials and performance tests. Most of the work for this contract will be performed by Converteam’s Pittsburgh office, with coordination from the Burlington, Ontario, Canada office. The Canadian Coast Guard Ship (CCGS) Sir Wilfrid Laurier is a 5,250 KW light icebreaker that operates in the western Arctic Ocean, with a mission of keeping shipping lanes open for cargo transport ships. The CCGS Laurier’s home port is in Victoria, British Columbia, was initially launched in 1986, and carries a crew of 26. The 3,812-ton vessel is 272 ft. long and has a cruising speed of 11 knots, and a cruising range of 6,500 miles. The ship is named in honor of Sir Wilfrid Laurier, the seventh Prime Minister of Canada from 1896 to 1911.
Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Nabors Posts Quarterly Loss as Drilling Activity Slows

Offshore driller Nabors Industries Ltd reported a quarterly loss, hurt by lower drilling activity amid a slump in global crude prices.   The company posted a net loss of $891.

Crowley Ships Massive Electrical Equipment

Crowley Maritime Corporation’s liner services group recently transported two massive electrical equipment enclosures with a combined weight of 196,000 pounds to San Juan, Puerto Rico.

Maersk Drilling Secures Contract for Newest Drillship

Maersk Drilling was awarded a contract from eni Ghana Exploration and Production Ltd. for employment of the newbuild drillship Maersk Voyager.   The contract

Coast Guard

Mariner Medevaced in Alaska

An ailing mariner was medevaced from a fishing vessel in Beaver Inlet, approximately 13 miles southeast of Dutch Harbor, Sunday, the U.S. Coast Guard reported.   The

Seafarers ... Get Some Rest!

With global focus on the mariner courtesy of MLC2006, reinforced by a number of high profile catastrophic maritime casualties that are directly linked to “the human factor,

Zeroing in on Zukunft

The U.S. Coast Guard Commandant addresses a packed Passenger Vessel Association meeting and outlines both the challenges and opportunities facing his organization.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Offshore Oil Pipelines Port Authority Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1799 sec (6 req/sec)