Coronado (LCS 4) Keel Laying

Tuesday, December 22, 2009
Photo courtesy Austal

Austal hosted an abbreviated U.S. Navy keel-laying ceremony for its second Littoral Combat Ship, Coronado (LCS 4).

Fabrication has started on twelve of the twenty-eight modules that will make up this 416.6 ft trimaran design. Six of the twenty-eight modules are currently being outfitted with ships equipment such as gas turbines, generators, and propulsion equipment, and electrical, piping and ventilation systems. Three modules have been erected in their pre-launch position.
 

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

New Power Optimization Solution for LNG Carriers

NAPA and DSME launch tailored NAPA-DSME Power Solution for LNG carriers; leading LNG carrier shipyard offers specialized performance monitoring solution   South Korean shipbuilder,

BWTS Newcomer Sees Early Success

Norwegian manufacturer of ballast water treatment systems MMC Green Technology reports it has sold more than 70 systems since going commercial with its MMC BWMS two years ago,

Design & Operation: Wind Farm Support Vessels

Offshore wind farm development has been led globally by the UK, followed by Germany. Both countries have governments with long term commitments to renewable energy.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1804 sec (6 req/sec)