Coronado (LCS 4) Keel Laying

Tuesday, December 22, 2009
Photo courtesy Austal

Austal hosted an abbreviated U.S. Navy keel-laying ceremony for its second Littoral Combat Ship, Coronado (LCS 4).

Fabrication has started on twelve of the twenty-eight modules that will make up this 416.6 ft trimaran design. Six of the twenty-eight modules are currently being outfitted with ships equipment such as gas turbines, generators, and propulsion equipment, and electrical, piping and ventilation systems. Three modules have been erected in their pre-launch position.
 

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Technip Wins Jurong's FPSO Conversion Contract

Technip has been awarded a topsides detailed engineering and procurement services contract by Jurong Shipyard Pte Ltd. The project is part of the conversion of a shuttle tanker into a floating,

Samsung Bags Order for Decks on Johan Sverdrup

Statoil, on behalf of the Johan Sverdrup license, has awarded Samsung the contract for decks for both the process and riser platforms.  The total contract value is NOK 7 billion.

Wartsila Tunnel Thruster Gets LR Approval

Wartsila has successfully passed the final step of the Lloyd's Register (LRS) classification society's Type Approval process to obtain an LR Type Approval Certificate

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1206 sec (8 req/sec)