Coronado (LCS 4) Keel Laying

Tuesday, December 22, 2009
Photo courtesy Austal

Austal hosted an abbreviated U.S. Navy keel-laying ceremony for its second Littoral Combat Ship, Coronado (LCS 4).

Fabrication has started on twelve of the twenty-eight modules that will make up this 416.6 ft trimaran design. Six of the twenty-eight modules are currently being outfitted with ships equipment such as gas turbines, generators, and propulsion equipment, and electrical, piping and ventilation systems. Three modules have been erected in their pre-launch position.
 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Crowley Christens 2nd LNG-ready Product Tanker

Crowley christens second of four newly built, LNG-ready product tankers for use in U.S. coastwise trade   Crowley Maritime Corp. has christened the second of

VT Halter Delivers ATB Tug to Bouchard

VT Halter Marine, Inc. announced the delivery of the M/V Morton S. Bouchard Jr., the first of the two 6,000 horsepower Twin Screw Articulated Tug Barge (ATB) tugs to Bouchard Transportation Co.

Damen Builds Cable Installer For Maersk Supply Service

New Damen-built vessel for Maersk Supply Service to undertake long-term charter with DeepOcean   A newbuild DP2 cable installation vessel, Maersk Connector, was

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0704 sec (14 req/sec)