Coronado (LCS 4) Keel Laying

Tuesday, December 22, 2009
Photo courtesy Austal

Austal hosted an abbreviated U.S. Navy keel-laying ceremony for its second Littoral Combat Ship, Coronado (LCS 4).

Fabrication has started on twelve of the twenty-eight modules that will make up this 416.6 ft trimaran design. Six of the twenty-eight modules are currently being outfitted with ships equipment such as gas turbines, generators, and propulsion equipment, and electrical, piping and ventilation systems. Three modules have been erected in their pre-launch position.

Maritime Today

The Maritime Industry's original and most viewed E-News Service

Maritime Reporter November 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Fincantieri Launches Nuclear Waste Vessel for Russia

New semisubmersible floating platform will be used to transport special material decommissioned by the Russian Navy    Itarus, the new semisubmersible floating

Interview: Mike Petters - President & CEO, HII

Last month Mike Petters, president and CEO of Huntington Ingalls Industries (NYSE:HII), was honored by the Coast Guard Foundation at the 35th Annual Salute to the United States Coast Guard,

Grandweld Delivers Vessel to ADNOC

United Arab Emirates leading shipyard Grandweld has delivered a dive maintenance and support vessel TAWAM1 to Abu Dhabi National Oil Company (ADNOC).   Grandweld

Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pipelines Salvage Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0704 sec (14 req/sec)