Crew Reunites for New Mission

Tuesday, July 27, 1999
The captain and officers who served on U.S. Navy Icebreaker U.S.S. Glacier, recently gathered for a reunion and to strategize for Glacier's restoration. Reunion participants included members from a crew of 300 servicemen and scientists, who, in 1961, successfully explored the most dangerous Antarctic region for a ship to enter: the Bellinghausen Sea and Thurston Island. Glacier's discoveries resutled in revisions to the world atlas. Glacier was transferred to the USCG in 1967 and operateed as USCGC Glacier until her decommissioning in 1986. USCG crewmembers are in the forefront of the restoriation of Glacier, currently moored near San Francisco. The Glacier Society was formed by crewmembers to restore Glacier so it may operate: As a museum ship and tourist attraction heralding its 32-year career in Polar exploration; As a learning platform for students in grades K-12; As a University At Sea for undergraduate, post-graduate and adult learning programs; and To conduct seagoing voyages for the U.S. Navy, USCG, Veterans groups and the general public. The Glacier Society has identified Bridgeport Harbor as an ideal setting for the ship. The ship is scheduled for her voyage from San Francisco to Connecticut sometime in the year 2000.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Hercules Offshore Filing for Bankruptcy Again

Hercules Offshore Inc said it planned to file for prepackaged Chapter 11 bankruptcy, just six months after the rig contractor emerged from bankruptcy protection.

DONG Energy Listing to Value Group at up to $16 Bln

DONG Energy's has set a potential $16 billion price tag on its stock market debut, giving investors a chance to buy into the growth in offshore wind power, but

Østensjø Rederi Orders Another Wind Farm Vessel

Rolls-Royce has signed a contract with shipyard Astilleros Gondan in Spain to design and equip a second Service Operation Vessel for ship owner Østensjø Rederi.

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0824 sec (12 req/sec)