Crowley to Christen Barge

Thursday, July 26, 2007
On July 28, Crowley Maritime Corporation will christen the 455-2, the second of three new Heavy Lift 455 series deck barges being built to handle project work for the offshore energy industry - primarily in the Gulf of Mexico. The 455-2 is one of three 400 x 105-ft.-wide deck barges to be built at Gunderson Marine's shipyard in Portland, Oregon. The media is invited to attend this christening, which will feature the traditional breaking of a champagne bottle against the hull and the subsequent launch and spectacular splashdown into the Willamette River.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

TOTE, Saltchuk Secure Financing for Marlin Class Vessels

Maritime Administration to Provide Title XI Loan Guarantee for World’s First LNG Containerships Today, the U.S. Maritime Administration (MARAD) announced a $324.

Transocean: Fleet Update Summary

Transocean Ltd. today issued a monthly fleet update summary which includes new contracts, changes to existing contracts, and changes in estimated planned out-of-service

Barczak Joins Alan C. McClure Associates

Naval architecture and engineering firm Alan C. McClure Associates (ACMA) announced today that Registered Professional Engineer Nicholas Barczakhas joined the ACMA team as a naval architect.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Pipelines Pod Propulsion Port Authority Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1326 sec (8 req/sec)