Crowley to Christen Barge

Thursday, July 26, 2007
On July 28, Crowley Maritime Corporation will christen the 455-2, the second of three new Heavy Lift 455 series deck barges being built to handle project work for the offshore energy industry - primarily in the Gulf of Mexico. The 455-2 is one of three 400 x 105-ft.-wide deck barges to be built at Gunderson Marine's shipyard in Portland, Oregon. The media is invited to attend this christening, which will feature the traditional breaking of a champagne bottle against the hull and the subsequent launch and spectacular splashdown into the Willamette River.
Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

KEP Marine Unveils KMGBL

KEP Marine – the manufacturer of type approved displays, computers and peripherals, announced  the release of the affordable, high-quality KMGBL Glass Bridge Light Displays.

New Load Measurement Solution for Port of Dampier

Strainstall designs and delivers a load measurement solution for the world’s largest floating wharf at Port of Dampier.   Strainstall, part of James Fisher and Sons plc,

Rolls-Royce Power Package for USS Zumwalt

Rolls-Royce announced delivery of the twin fixed pitch propellers to Bath Iron Works for installation on the U.S. Navy’s most modern surface combatant, the future USS Zumwalt,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Offshore Oil Pod Propulsion Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1560 sec (6 req/sec)