Crowley to Christen Barge

Thursday, July 26, 2007
On July 28, Crowley Maritime Corporation will christen the 455-2, the second of three new Heavy Lift 455 series deck barges being built to handle project work for the offshore energy industry - primarily in the Gulf of Mexico. The 455-2 is one of three 400 x 105-ft.-wide deck barges to be built at Gunderson Marine's shipyard in Portland, Oregon. The media is invited to attend this christening, which will feature the traditional breaking of a champagne bottle against the hull and the subsequent launch and spectacular splashdown into the Willamette River.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Navios Partners Appoints Lampros Theodorou as Director

US-listed owner and operator of container and dry bulk vessels Navios Maritime Partners has appointed Lampros Theodorou to its Board of Directors.   “We are delighted Mr.

Fundraiser Held for USS Gerald R. Ford Crew

Blackmer, a company in positive displacement and centrifugal pump and reciprocating compressor technologies, has a relationship with the U.S. Military that dates

Meercat Workboats Scores a Hat-trick

The U.K.’s Meercat Workboats says it scored a hat-trick; the Hampshire-based boat builder announced it is moving premises, that Seawork was a huge success and that

 
 
Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0803 sec (12 req/sec)