Cutter Completes Iraqi Aid Mission

Wednesday, May 07, 2003
Coast Guard cutter Walnut, a 225-ft. buoy tender homeported in Honolulu, today completed its 20-day humanitarian mission of properly marking the navigational channel of the Khawr Abd Allah waterway leading from the North Arabian Gulf to Iraq’s critical port of Umm Qasr. The Walnut completely replaced 30 buoys and repaired an additional five along the 41-mile waterway, vastly improving the navigational safety of the waterway for humanitarian aid sailing to the port and providing a critical step towards the economic recovery of the people of Iraq. The majority of the equipment used in the navigational improvements was located in a warehouse in Umm Qasr and was inspected and upgraded to ensure that the buoys matched as closely as possible to the charted channel. The Walnut was originally deployed to the North Arabian Gulf with an oil spill recovery system in the event the regime of Saddam Hussein committed any acts of environmental terrorism. When those threats did not materialize the cutter conducted maritime interdiction operations enforcing U.N. Security Council resolutions, participated in the search for two downed United Kingdom helicopters, and patrolled and provided assistance to captured Iraqi offshore oil terminals.
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Maritime Security

Pirates and Hold-ups: Crime Strikes Venezuela's Oil Industry

When night falls over western Venezuela, armed gangs known as "pirates" sometimes ride boats into muggy Lake Maracaibo to steal equipment from oil wells.   In the country's Paraguana peninsula,

Activists Planning Protest Against Shell's Arctic Business

U.S. environmental activists said they planned to protest on Tuesday against the launch of the second of two oil rigs central to Shell's plans to drill for oil in the Arctic.

Samsung Bags Order for Decks on Johan Sverdrup

Statoil, on behalf of the Johan Sverdrup license, has awarded Samsung the contract for decks for both the process and riser platforms.  The total contract value is NOK 7 billion.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Port Authority Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1084 sec (9 req/sec)