Cutter Completes Iraqi Aid Mission

Wednesday, May 07, 2003
Coast Guard cutter Walnut, a 225-ft. buoy tender homeported in Honolulu, today completed its 20-day humanitarian mission of properly marking the navigational channel of the Khawr Abd Allah waterway leading from the North Arabian Gulf to Iraq’s critical port of Umm Qasr. The Walnut completely replaced 30 buoys and repaired an additional five along the 41-mile waterway, vastly improving the navigational safety of the waterway for humanitarian aid sailing to the port and providing a critical step towards the economic recovery of the people of Iraq. The majority of the equipment used in the navigational improvements was located in a warehouse in Umm Qasr and was inspected and upgraded to ensure that the buoys matched as closely as possible to the charted channel. The Walnut was originally deployed to the North Arabian Gulf with an oil spill recovery system in the event the regime of Saddam Hussein committed any acts of environmental terrorism. When those threats did not materialize the cutter conducted maritime interdiction operations enforcing U.N. Security Council resolutions, participated in the search for two downed United Kingdom helicopters, and patrolled and provided assistance to captured Iraqi offshore oil terminals.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Maritime Security

2 Rescued Near Humber Bridge by Maritime & Coastguard Agency

Humber Coastguard received a call just after 10am this morning reporting two people in the water after their powered canoe had capsized just west of the Humber Bridge.

NAVSEA Receives 3 DoD Value Engineering Awards

Naval Sea Systems Command (NAVSEA) was recently announced as the winner of three fiscal year 2013 Department of Defense (DoD) Value Engineering Achievement Awards.

Clacton to Holland-on-Sea Coastal Defence Scheme

A major £36 million coastal defence scheme from Clacton Pier to Holland Haven is to get underway this week. The first phase of works will begin with demolishing

 
 
Maritime Contracts Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0959 sec (10 req/sec)