Cutter Suction Dredge Designed to Withstand Siberian Weather

Monday, February 24, 2003
A Russian customer placed an order for a CSD350 Cutter Suction Dredge with VOSTA LMG. This cutter suction dredge will be one with special requirements, as it is due to operate in Siberia with weather conditions up to minus 40º Celsius. Special attention went out to the extreme operating (-15OC) and winterizing conditions (-40OC). Engines, hydraulic system, suction pipeline, discharge pipeline, pump assembly, the heating systems, lubrication oil and hydraulic oil are adjusted to these conditions. VOSTA LMG will deliver the dredge early April 2003. The Russian contractor plans to use the dredge to construct sand roads on the northern tundra’s to make the oil and gas fields accessible during the summer period when they are swampy after being frozen in the winter. The dredge is of the dismountable and easy transportable type so it can transported to the tundra’s before summer. After the summer, when the temperature starts to decrease, the dredge can be dismounted and stored.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Young Taken on PESA Advisory Board

Hoover Container Solutions’ chairman and CEO, Donald Young, has been nominated and elected to the Petroleum Equipment & Services Association (PESA) Advisory Board for a three-year term.

US Navy Tests Latest Aegis Weapon System

The U.S. Navy conducted a series of cooperative air defense test exercises with the Spanish navy that culminated in live missile firing events using the latest Aegis Weapon System baseline July 20-21.

Antwerp Port CEO Scoops Baron Title

After 25 years as CEO of Antwerp Port Authority, Eddy Bruyninckx has been raised to the nobility by H.M. the king of Belgium with the rank of baron. In Belgium

Shipbuilding

LNG: Did the Greeks Get it Wrong?

In December 2013, Alibra’s market report front page read: “When in shipping, do as the Greeks do.” At that time, Alibra was referring to the fact that 31% of the

Ithaca’s FPF-1 platform to be moved to Stella field

Ithaca Energy Inc. reports that the "FPF-1" floating production facility has completed the required inclination test as planned and departed the Remontowa shipyard in Gdansk, Poland.

Live Fish Carrier Launched at Gondan

At high tide, the vessel “MARTIN SÆLE”, the first Live Fish Carrier built by Gondan Shipyard in Figueras, was successfully launched today. Representatives of the owner of the vessel,

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Pod Propulsion Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0919 sec (11 req/sec)