CVN 78 Ship Specifications Signing Scheduled for Sept. 5

Friday, September 01, 2006
The Naval Sea Systems Command’s (NAVSEA) Ship Design, Integration and Engineering Directorate and the Program Executive Officer for Aircraft Carriers (PEO Carriers) will commemorate the certification of CVN 78 ship specifications in a signing and awards ceremony to be held Sept. 5 in the NAVSEA Headquarters auditorium, Washington Navy Yard. Rear Adm. Charles H. Goddard, NAVSEA vice commander, will also present the Award of Merit for Group Achievement to the CVN 78 Design Team in recognition of this major milestone in the future aircraft design process.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Singapore Exchange in Talks to buy Baltic Exchange

Baltic Exchange privately owned by 380 shareholders. The Singapore Exchange (SGX) is in exclusive talks to buy London's Baltic Exchange, which has been at the

Euroseas Faces Headwinds, Reports Loss

Euroseas Ltd. (NASDAQ: ESEA), an owner and operator of drybulk and container carrier vessels and provider of seaborne transportation for drybulk and containerized cargoes,

Iranian Port Deal: Modi's Masterstroke

Indian Prime Minister Narendra Modi signed a deal to develop the Chabahar port in Iran for which India will extend $500 million. The historic pact makes Chabahar

Navy

Mount Whitney Makes History

USS Mount Whitney (LCC 20), the U.S. 6th Fleet flagship, made history today as the first amphibious command ship to have an MV-22B Osprey land on its flight deck, May 23, 2016.

This Day In Naval History - May 24

1917 - The first U.S. convoy left Hampton Roads, Va. to cross the North Atlantic after entering World War I. During the 18 months of war while American vessels escort convoys through the war zone,

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Pipelines Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0863 sec (12 req/sec)