Decommissioning for Nuclear Ship

Thursday, January 29, 2009

The Nuclear Regulatory Commission (NRC) issued a notice stating that it is seeking comments on the Post Shutdown Decommissioning Activities Report (PSDAR) for the Nuclear Ship Savannah. The ship was brought to power in 1961 and removed from service in 1970.  Final reactor shutdown occurred in November 1970 and defueling was completed in fall 1971.  Comments on the PSDAR should be submitted by February 13.  74 Fed. Reg. 4988  (January 28, 2009).

(Source: Holland & Knight)

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

Robert Allen Designed Tug Launched in Italy

Rimorchiatori Riuniti bolsters Porto di Genova fleet with another Robert Allan Ltd. designed tug Rimorchiatori Riuniti currently operates five Robert Allan Ltd.

URAG Orders Two ASD Tugs from Damen

URAG, a German port and offshore towage provider based in Bremerhaven, has placed an order for two Damen ASD 2411 tugs. The contract was signed at the SMM exhibition in Hamburg.

Hyundai Mipo Dockyard Delivers Fourth PSV

Hyundai Mipo Dockyard (HMD) delivered the fourth high value platform supply vessel (PSV) for BP Shipping at its main shipyard in Ulsan, South Korea. HMD won

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0962 sec (10 req/sec)