Deepwater Fast-Response Cutter Reaches Milestone

Tuesday, May 24, 2005
The U.S. Coast Guard's, 140-ft. fast-response cutter has reached a systems requirements milestone resulting in the ship being one step closer to construction commencement. The fast-response cutter is being built by Integrated Coast Guard Systems (ICGS), a joint venture between Northrop Grumman Corporation (NYSE: NOC) and Lockheed Martin (NYSE: LMT), under the Integrated Deepwater System Program. The purpose of the systems requirements review was to present the ship concept to the Coast Guard and to confirm the customer requirements have been sufficiently developed, so the ICGS team can proceed to design development. The new cutter has been developed to meet post-Sept. 11 mission requirements. The new composite-hulled craft, to be manufactured at Northrop Grumman's Gulfport, Miss., composites center, will have a 40-year hull-life.

The cutter will be interoperable with other Deepwater assets and will operate at 30+ knots, providing exceptional response and reaction capability. Typical missions will include near-shore fisheries patrol, migrant and drug interdiction, barrier patrols and augmenting patrols in areas of concern.

"We are facing very aggressive schedule goals for this program," said Mike Duthu, Northrop Grumman Fast-Response Cutter program manager. "To meet specific homeland security defense needs, the program has been accelerated by nearly 10 years from what was originally proposed at the time of contract award in June 2002. During the execution of each phase, we will have a Northrop Grumman team continually planning, scoping and proposing the next phase to achieve program milestones."

The systems requirements review, held at Northrop Grumman Ship Systems sector's shipyard in New Orleans, included demonstrations on the fast-response cutter's hull, mechanical and electrical design, the Command, Control, Communications and Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) suite and logistics support.

ICGS also presented information on the ship's preliminary operational plans as an asset in the Integrated Deepwater System. As a result of the systems requirements review process, the Fast-Response Cutter program now moves into the preliminary design phase, with the customer review scheduled for this August.

Email AddThis Feed Button Share
Maritime Reporter May 2012 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Fire Aboard Submarine in U.S. Shipyard

Fire fighters battle a blaze in the nuclear submarine 'USS Miami' in the US Navy shipyard in Maine According ot CNN the fire was not out six hours after the initial response,

Australian Warship Visits Canada Naval Base

HMAS Perth has reaffirmed close Australian Defence ties to Canada with a visit to the Canadian Forces Base Esquimalt in Victoria, Canada The visit by the Royal

This Day in Naval History - May 23

From the Navy News Service:   1850 - Navy sends USS Advance and USS Rescue to attempt rescue of Sir John Franklin's expedition, lost in Arctic.

Coast Guard

Coast Guard Recognizes Industry's Environmental Excellence

The U.S. Coast Guard announced the award recipients for the 2012 Biennial Rear Admiral William M. Benkert, Marine Environmental Protection Award for Excellence

Holland America Line Wins USCG Eco Award

Holland America Line receives second Benkert Award for its marine environmental initiatives as U.S. Coast Guard award recognizes line's fleetwide efforts  At a recent ceremony,

Big Value in Small Packages

Military appetite for powerful and agile smaller platforms heats up.   The use of small craft by terrorist organizations and domestic terrorist cells is

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Salvage Shipbuilding / Vessel Construction Sonar Winch
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright

Time taken: 0.0524 sec (19 req/sec)