Derecktor Awarded High Speed Ferry Contract

Monday, July 24, 2000
Derecktor Shipyards has been granted a contract by Lighthouse Landings to construct a 115 ft. (35 m) aluminum high-speed catamaran ferry to be built at the yard's Mamaroneck, N.Y. facility. The catamaran holds the distinction of being the premiere vessel in a fleet of four that will be built for a new passenger service scheduled to begin in Spring/Summer 2001 between Stamford, Conn. and New York City. The vessels' operator, Lighthouse Landings, through its operating subsidiary, New York Fast Ferries Services, Inc. (NYFF) currently provides fast commuter service between Highlands, N.J. and New York City. The new vessels will be built to a design in accordance with Nigel Gee and Associates (NGA) of Southampton, England. Developed with Derecktor specifically for the Stamford ferry service, the vessels will transport 250 commuters at a service speed of 42 knots. Able to arrive at their Wall Street port in less than one hour, the high-speed vessels are reportedly dubbed as the fastest commuter ferries ever to be put into service in the U.S. Equipped with high-speed hulls derived from those developed for the 57-knot Derecktor 148 ft. (45 m) catamaran, the boats run on four Detroit Diesel engines each developing 2,300-hp driving four Kamewa A50 water jets through ZF456 reversing gearboxes. The jets are outfitted with active interceptors for maximum ride control and have no exterior lube or hydraulic oil lines, thus minimizing the risk of spill in case of line or hub seal failure. Technologically driven safety equipment onboard includes high-speed ARPA radars and digital chart plotting system with radar overlay. Implemented on the vessels is the "Quad" configuration - four engines and four jets - with inherent propulsion and steering redundancy, offering reliability and increased safety.
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

LNG Vessel with Wartsila Integrated Solutions Delivered to Evergas

The first in a series of 27,500 cbm 'Dragon' class vessels ordered by Evergas, a world renowned owner and operator of seaborne petrochemical and liquid gas transport vessels,

Executive Changes at Transocean

Transocean Ltd. today announced that, as mutually agreed with the company, Esa Ikaheimonen is stepping down as Executive Vice President and Chief Financial Officer effective immediately.

BMT, Endeavour Energy Win Africa’s LNG Import Terminal Contract

BMT Asia Pacific (BMT), a subsidiary of BMT Group Ltd, has been appointed Owners Engineer and lead design consultant by Endeavour Energy for the development

Shipbuilding

LNG Vessel with Wartsila Integrated Solutions Delivered to Evergas

The first in a series of 27,500 cbm 'Dragon' class vessels ordered by Evergas, a world renowned owner and operator of seaborne petrochemical and liquid gas transport vessels,

Keel Laid for Russia’s Next Generation Icebreaker

The world’s biggest nuclear-powered icebreaker keel laying ceremony took place of at the Baltic Shipyard on 26 May 2015. Heads of Atomfflot, the Baltic Shipyard

Wärtsilä Bags BWM Systems Order from Jinhai Shipyard

Wärtsilä Corporation, has received an order for ballast water management systems (BWMS) for three new container ships being built for a major European shipping

 
 
Maritime Contracts Maritime Security Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1278 sec (8 req/sec)