Derecktor Cuts Plate for Alaskan Ferry

Friday, February 14, 2003
Derecktor Shipyards held a plate cutting ceremony at its Bridgeport Connecticut facility for the first piece of plate cut for the highspeed ferry M/V Chenega. George Capacci, General Manager of State of Alaska’s Department of Transportation & Public Facilities, kicked off construction with the push of a button, starting the computer-controlled machinery, cutting the first plate for the hull of the ferry. This ceremony marked the start of the construction of the second of two 235- foot high-speed ferries for the Alaska Marine Highway System. Also attending the ceremony representing the City of Cordova, homeport for the M/V Chenega, were City Councilman Gary Graham and Kate Tesar. Attending on behalf of the State of Connecticut were representatives for Senator Christopher Dodd and for Congressman Christopher Shays, members from the Connecticut State Legislature, the Connecticut Department of Transportation, the Connecticut Department of Economic and Community Development, the Connecticut Development Authority, and the Bridgeport Port Authority. The M/V Chenega will sail in the Prince William Sound area of south-central Alaska, connecting the ports of Cordova, Valdez, and Whittier. The first vessel, M/V Fairweather, is scheduled to enter service between Juneau and Sitka at the beginning of 2004 with the M/V Chenega expected to enter service one year later. Passengers on these vessels will enjoy sweeping views of Alaska’s beautiful natural coastline while riding in comfort, due to modern and fully equipped heated and air-conditioned cabins with airline-style seating, an available snack bar, and minimal ship motions. With the high operating speeds achievable by these vessels, travel time between ports will be significantly shorter than what is possible with conventional ferries. Alaska transportation officials expect that with the opening of these new routes, and with dramatically reduced travel times, the demand from tourists, local residents and commercial venues will increase, thus improving the quality of life for the residents of these communities. This project is considered a milestone in the history of US shipbuilding since these will be the first vessels of their kind ever built in this country. Derecktor Shipyards teamed up with renowned high speed vessel naval architecture firm of Nigel Gee & Associates, of Southampton, England, and will use one of NGA’s original designs, developed expressly for the Alaska project. The new boats are designed to be safe, high-speed RO/RO passenger ferries that minimize costs and can interface with existing AMHS docks and pier side facilities. Each of the vessels is 235 feet (72 meters) long, carries 250 passengers and 35 cars (or a combination of cars, trucks, and RVs), and travels at speeds up to 36 knots (41 miles per hour) safely and comfortably through sea conditions of up to 10-foot waves. The vessels employ a catamaran (twin-hull) design of lightweight aluminum construction. They are powered by four MTU medium-speed diesel engines, each driving a Kamewa waterjet propulsor. Classed with DNV _ 1A1 HSLC, R3 and with full USCG compliance to SOLAS/HSC Code Cat. B, these aluminum vessels will take advantage of Derecktor’s experience and high level of craftsmanship in the field of highly-stressed aluminum construction.
Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Transas: The Bridge to Tomorrow

Transas was founded in 1990, by a group of former navigators and engineers, who at that time envisioned ways in which computers could revolutionize maritime safety, communications and security.

ZF Celebrating 100th Anniversary

2015 marks the 100th anniversary of the foundation of ZF Friedrichshafen AG   Zahnradfabrik GmbH was founded in 1915, and through a 100-year history has developed

Signal Ship Repair Achieves OSHA Milestone

Signal International announced that on December 31, 2014, the Signal Ship Repair Operations located in Mobile, Alabama achieved one full year and worked 387,926 manhours,

Legal

Fugitive Treasure Hunter Arrested in Florida

An Ohio man who recovered as much as $400 million in gold from a shipwreck has been arrested in Florida after two years on the run and was scheduled to appear in federal court on Wednesday.

West Coast Port Talks Clear Hurdle

Shipping companies and the union for 20,000 dockworkers at nearly 30 U.S. West Coast ports have cleared a major hurdle in their protracted labor talks, clinching

NewLead Holdings Acquire 5 Vessels

NewLead Holdings Ltd. announced today that it recently added five bitumen tanker vessels to its fleet. The Company has expanded its fleet to 10 vessels in less

 
 
Maritime Standards Naval Architecture Offshore Oil Pipelines Pod Propulsion Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1733 sec (6 req/sec)