Detroit River Barge Runs Aground

Wednesday, November 05, 2008

The U.S. Coast Guard and local salvage companies safely removed a barge that ran aground Sunday, at 6:30 p.m., on the Detroit River.

The 115-meter barge, which contains approximately 3.7 million gallons of gasoline, was freed Monday at approximately 2 p.m.

The 41-meter tug William J. Moore and the barge were leaving Sarnia, Ontario, bound for Montreal when the barge ran aground approximately 100 yards northwest of the Detroit River Light.

U.S. Coast Guard Air Station Detroit launched an HH-65 Dolphin helicopter to assess damages and look for any pollution.  Coast Guard Sector Detroit dispatched three prevention dept. inspectors to the William J. Moore to check for damage.  No pollution or gasoline sheens have been reported.

The tugs Superior, Wyoming and Nebraska assisted in freeing the barge.

The tug and barge are en route to Port Colborne, Ontario, for an inspection by Transport Canada.  Sector Detroit and Transport Canada will work together to investigate the incident.

(Source: Ninth District External Affairs, U.S. Coast Guard)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Casualties

Italian Ship Rescues 26 Migrants off Libya

An Italian merchant ship rescued 26 migrants off the coast of Libya in rough seas and others were feared missing, the Coast Guard said on Saturday. The Coast

Disabled Fishing Vessel Towed to Maine

The 60-foot fishing boat Paulo Marc was towed by the crew of U.S. Coast Guard Cutter Moray after the fishing vessel became disabled Wednesday about 90 miles east of Portland, Maine.

Fishing Crew Missing off Wales

The U.K. Coastguard is searching for the crew of a sunken fishing vessel near St David’s Head, Pembrokeshire.   The Coastguard said it received a 999 call from

Barges

USCG Uses Skiff Ice Boat to Rescue Injured Man

The U.S. Coast Guard medically evacuated a man off of a dredging barge in Lake Erie near Sandusky, Ohio, Wednesday evening. At approximately 5:45 p.m., a good

New Tank Barge Delivered to Harley Marine

The newly built tank barge, the Fight A.L.S., was delivered to Harley Marine Services on February 19, 2016.   Designed by Elliott Bay Design Group (EBDG) and constructed at Vigor Fab in Portland,

AWO, Stakeholders 'Barge In' at Capitol Hill

American Tugboat, Towboat and Barge Industry Urged Support for American Jobs, Vessel Discharge Reform, and Waterways Infrastructure.   Members of the American Waterways Operators,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0464 sec (22 req/sec)