Dismantling Ban Applies to Second Two MARAD Vessels

Monday, November 17, 2003
The U.K. Environment Agency has reiterated the conditions imposed last week on the storage of U.S. naval vessels by Able UK at Hartlepool on Teesside. Modifications made by the Agency to the conditions of the waste management licence held by Able UK apply to all waste ships, from whatever source. The conditions cover the US vessels Canopus and Compass Island, which it has now been decided will also be stored on Teesside alongside the vessels Caloosahatchee and Canisteo which docked earlier in the week. The license modifications mean that no dismantling, cutting or breaking of ships in any way or form is permitted. The Environment Agency has powers to enforce these conditions. As did the two vessels Caloosahatchee and Canisteo, the second pair of US vessels will dock at Able UK at Hartlepool under supervision of the harbour authority PD Teesport. Assessments will be made by the UK Maritime and Coastguard Agency (MCA) to ascertain the integrity of the vessels' structures and safety systems following their passage from the US to ensure, in conjunction with Environment Agency assessments, that the vessels pose no risk to the environment. As a precaution, the Environment Agency has required floating containment booms to be put in place, and is conducting a regular regime of daily and weekly inspections to ensure their integrity. A baseline survey of the estuary waters was completed by the Environment Agency prior to arrival of the first two vessels, and the Agency is conducting a weekly programme of monitoring, to specified standards, of both dock and estuary waters.
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Environmental

Shipping is Cutting CO2 Emissions

London-based shipping advisors Drewry Supply Chain Associates said that shipping liner operators have made significant inroads into cutting CO2 emissions.   In

Naval Authorities Rely on OSE Separators from GEA

The trend of modernizing ships and fitting them with more efficient separator systems, which has been noticeable since 2014 particularly in Europe and North America,

MacGregor's Pusnes bow loading systems for Suezmax Tankers

MacGregor, part of Cargotec, has secured contracts to supply Pusnes bow loading systems for three newbuild shuttle tankers intended for operations in Brazilian waters.

 
 
Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1373 sec (7 req/sec)