Dockwise Awarded MSC Contract

Wednesday, September 12, 2007
Dockwise Ltd., has been awarded a contract by U.S. Military Sealift Command for the use of one of its specialized open stern vessels for offshore operational design tests. The contract is due to be executed late 2008 and has a gross value in excess of $25m, including the costs of modification of the vessel. This is the fourth time Dockwise will provide one of its large heavy transport vessels to the U.S. Navy for offshore operational tests. These tests are meant to provide data and design criteria for a new navy vessel called MLP (Mobile Logistics Platform). These new MLP vessels are aimed to be part of the navy's sea-basing effort to facilitate the transfer of material from large cargo ships to an intermediate platform for ultimate transfer to shore on various types of landing crafts. Dockwise will provide one of its large flat deck open stern vessels that will be outfitted with a number of technical adjustments required to perform the various tests, amounting to approximately $10m. The testing off the east coast of the U.S. will provide required data that will assist with ramp design and motion compensation in various sea states.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Diana Shipping Enters Contract with SwissMarine

Diana Shipping Inc., through a separate wholly-owned subsidiary, has entered into a time charter contract with SwissMarine Services S.A., Geneva, for one of its Ice Class Panamax dry bulk vessels,

UAE Top Court: Physical Bunkers Suppliers Have No Right to Recourse against Owners/Charterers

The OW saga - UAE Federal Supreme Court decides that physical suppliers of bunkers have no right to recourse against Owners/Charterers. In the first decision

Panama Opens Canal Extension Amid Risk, Cost Issues

Panama opened the long-delayed $5.4 billion expansion of its shipping canal amid cheering crowds on Sunday, despite looming economic uncertainty in the shipping

Navy

US Navy Accepts delivery of 7th Austal EPF

Austal USA’s Expeditionary Fast Transport (EPF) team finalized the delivery of USNS Carson City (EPF 7) to the U.S. Navy during a small document-signing event held onboard the ship on June 24, 2016.

This Day In Naval History: June 27

1861 - While commanding a gunboat flotilla, Cmdr. James Harmon Ward is mortally wounded by a musket ball while aiming the bow gun of his flagship, USS Thomas Freeborn at Mathias Point, Va.

Austal Delivers Seventh EPF7 to US Navy

Austal Limited (Austal) informed that the U.S. Navy has accepted delivery of USNS Carson City (EPF 7) from Austal USA, during a ceremony held aboard the ship at Austal USA’s shipyard in Mobile,

 
 
Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0720 sec (14 req/sec)