Dockwise Backlog Update

Wednesday, March 10, 2010

Dockwise Ltd. announced that contracts have been secured by its subsidiary Dockwise Shipping.  Next to an engineering assignment, the transportation of a semi- submersible rig, a jack- up rig and river barges for a value of $20m were signed for the short term. For execution in 2012 Dockwise received a Letter of Award for the transport and installation by means of a float over of a large offshore production platform in the Far East for a value of $45m.

Dockwise has been contracted to transport drilling rigs to Australia and Rotterdam respectively. The bulk of the rig contract work is for completion within the first half of 2010. Total contract revenues are expected to be approximately $20m.

The letter of award for the new float over brings the current total float-over contracts within Dockwise's backlog to five.  Execution is scheduled for 2012 for a total value of approximately $45m. After the successful completion of the CPOC float-over in August 2009, the addition of this float-over to the already awarded Bongkot (2011), OFON (2012) and Vyborg (2010 and 2011) float-overs is further confirmation of Dockwise's leading position as a full-service float-over contractor to the oil & gas industry.

In a float-over contract, Dockwise delivers value for clients by providing a complete transportation and logistical package, as well as the execution of the technically challenging float-over process.  In view of the trend to module assembly and remote installation in extractive industries, Dockwise is aiming to grow revenues earned in float-overs and logistical management services to approximately 50% of total income in the medium to long term.

André Goedée, Chief Executive, Dockwise Ltd., "Once again, the competitive strength of a large well-dispersed fleet has secured three contracts in a tough spot market. Our float over award, brings the group of float-over contracts in our backlog to five, now totaling almost $200m, and underlines our growth in this segment.”

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Unique Technologies Improve Port Security

Practical results from the SUPPORT (Security UPgrade for PORTS) project, coordinated by BMT Group Ltd. and part-funded by the European Commission’s FP7 Security

CMM Takes Delivery of Damen PSV for Brazil

New supplier CMM Gravity to start on long-term contract with Petrobras. CMM has taken delivery of a Damen Platform Supply Vessel 3300. The 80-meter, 3,300t deadweight

Ship as Lifeboat Concept Disputed by ICV

A recent meeting at the National Transportation Safety Board in Washington, D.C. (attended by International Cruise Victims (ICV) Board representatives) discussed

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1422 sec (7 req/sec)