Dominion Resumes LNG Operations

Friday, July 25, 2003
The Coast Guard will escort a liquefied natural gas (LNG) shipment into Dominion’s natural gas facility in Lusby, Md., Friday about 2 p.m.; the first vessel to unload product at the facility in 23 years. The Coast Guard Captain of the Port of Baltimore in consultation with other federal, state, and local agencies verified the Cove Point facility is ready to resume operations and is capable of safely receiving and handling shipments of LNG. Homeland Security is a top priority of the Coast Guard, and the agency’s marine safety offices in Hampton Roads, Va., and Baltimore worked with the Maryland Department of Natural Resources Police, Virginia Marine Patrol and other local maritime enforcement partners on security related plans. A 500-yard security zone will be established around the Cove Point facility and the LNG ship, the Norman Lady. The Coast Guard worked closely with Cove Point during the last three years to prepare the facility for the initial delivery and will continue this relationship to ensure the safe and secure shipping and offloading of LNG as long as the facility is operational. The Norman Lady is an 800-ft. LNG vessel and will be carrying approximately 87,000 cubic meters of LNG.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Info-X Invests in $5m Headquarter Expansion

Transportation solutions provider capitalizes on outsourcing trend Info-X Software Technology, provider of software solutions and back-office support to U.S.

Daihatsu Joins ClassNK Research Project

Classification society ClassNK announced that it will embark on a joint research project together with Daihatsu Diesel Mfg. Co., Ltd. Through the partnership, ClassNK

Ecospeed Fuel and Cost Saving Solutions at SMM

Ecospeed announced it will exhibit its line of fuel and cost saving solutions at SMM in Hamburg. Ecospeed and fuel savings Routine in-water cleaning results

LNG

Policy Uncertainty Threatens to Slow Renewable Energy Momentum

IEA forecast sees renewable power as a cost-competitive option in an increasing number of cases, but facing growing risks to deployment over the medium term. The

SHIPPINGInsight Extends Early-bird Registration

SHIPPINGInsight 2014 is extending the deadline for early-bird registration to Sept. 15. Attendees registering online at www.shippinginsight.com/choose-event prior to midnight Sept.

LNG Finalizes Acquisition of Bear Head LNG Project

Liquefied Natural Gas Limited today informed having finalised the acquisition of 100% of Bear Head LNG Corporation (BHLC). This follows the announcement

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Pipelines Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1408 sec (7 req/sec)