Drew Marine Announces New Central Gas Installation System

Tuesday, August 26, 2003
Ashland's Drew Marine announced today the release of the new MANY-FLOW(1) CGI (Central Gas Installation) Systems for onboard welding requirements. The MANY-FLOW design upgrades the traditional pipe-and-fittings construction of older oxygen and acetylene distribution systems. Easy to install, the unique, unit-body, three-gas control accommodates two or three cylinder inputs and provides a simple way to customize the CGI system of any ship. The MANY-FLOW system features a forged block assembly, is less prone to leaks, and offers increased safety, economy, and convenience of operation. "MANY-FLOW system raises the bar on safety, economy and ease-of-use in ship welding operations," says Rich Mansmann, marketing manager for welding and refrigeration products at Drew Marine.
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

New Products

Rosneft Ships First Oil From Chayvo Field

Rosneft commenced shipment of crude oil extracted at the Northern Tip of Chayvo license off the coast of Sakhalin, with the first tanker carrying Sokol-grade crude leaving port on November 21.

New Tidal Wave Energy Device Completes Sea Trials

In the continuing quest to harvest efficient, renewable energy from the power of the world’s tides, an organization called Sustainable Marine Energy’s announced

New Portable Power System from SWE

Southwest Electronic Energy announced the launch of POW-R Tote, a rugged, lightweight, 12V/117Ah portable power system which provides compact-convenient energy

Offshore

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0799 sec (13 req/sec)