Drew Marine Announces New Central Gas Installation System

Tuesday, August 26, 2003
Ashland's Drew Marine announced today the release of the new MANY-FLOW(1) CGI (Central Gas Installation) Systems for onboard welding requirements. The MANY-FLOW design upgrades the traditional pipe-and-fittings construction of older oxygen and acetylene distribution systems. Easy to install, the unique, unit-body, three-gas control accommodates two or three cylinder inputs and provides a simple way to customize the CGI system of any ship. The MANY-FLOW system features a forged block assembly, is less prone to leaks, and offers increased safety, economy, and convenience of operation. "MANY-FLOW system raises the bar on safety, economy and ease-of-use in ship welding operations," says Rich Mansmann, marketing manager for welding and refrigeration products at Drew Marine.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

New Products

New AVEVA ISM Bridges the Gap

AVEVA launches a new application for governing asset information using a standards-based methodology. AVEVA announced the launch of AVEVA Information Standards Manager (AVEVA ISM),

XtendFRESH Now Available from Carrier Transicold

The XtendFRESH atmosphere control system, which preserves quality and extends shipping distances for perishables shipped in refrigerated containers, is now available from Carrier Transicold.

Voith to Exhibit High Efficiency and DP Systems at SMM

At this year’s SMM in Hamburg, Voith will showcase propulsion systems and vessel concepts focusing on high efficiency and dynamic positioning even under challenging conditions.

Offshore

BOEM Extends O&G Lease Comment Period

The Bureau of Ocean Energy Management (BOEM) is extending the public comment period for the Request for Information (RFI) and Comments on the Preparation of the

Total E&P is First to Use FROG-XT4

Total E&P is the first to use Reflex Marine’s newly developed FROG-XT4 on the Odudu field in Nigeria. The French operator purchased the crew transfer device

New Standard gets Revised Program for Cooper Basin Approved

New Standard Energy Limited (New Standard) advises that it has received approval for amendments to its five year work program in PEL570 in the Cooper Basin. As part of the revised program,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Pipelines Port Authority Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2386 sec (4 req/sec)