Dutch Parliament OKs Maasvlakte 2 Project

Tuesday, October 10, 2006
The Dutch Parliament voted in favor of the construction of Maasvlakte 2, the new port district of Rotterdam. This gives the green light to the next phase: in 2007 a number of spatial planning and licensing procedures must be completed before actual construction can get underway in 2008.

A parliamentary majority also supported the proposal to construct the outer contour of Maasvlakte 2 in a single operation. This is an attractive option, both for environmental and financial reasons. It had been proposed earlier moving these sea defenses further out to sea in phases, in response to the need for industrial space. However, no-one in Rotterdam is concerned about market demand for space, so that the construction of the definitive sea defenses in a single operation is justified. European legislation on air quality that came into force in 2005 has placed extra pressure on preparations for the Maasvlakte 2 project during the past eighteen months. Maasvlakte 2 will mean extra traffic and could therefore cause these limits to be exceeded even further. Before the subject of Maasvlakte 2 was debated in parliament, the Ministers of Transport, Public Works and Water Management (V&W) and Housing, Spatial Planning & the Environment (VROM) had announced a package of measures that could be introduced in phases if necessary to improve air quality in the region to such an extent that, when Maasvlakte 2 is in use, air quality in the region will not get any worse. The package includes an incentive scheme for cleaner engines for inland vessels and dynamic traffic management for road transport and inland shipping.

Two construction consortia are currently competing for the construction of Maasvlakte 2: Boskalis - Van Oord of the Netherlands and Jan de Nul - Dredging International of Belgium. The Port Authority expects to conclude a contract with one of these consortia in mid-2007. A contract was concluded with APM Terminals last spring for a container terminal. In addition, there is currently an open tender process in progress for a container terminal.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

USCG Tall Ship Sailing to the Bahamas

The U.S. Coast Guard Cutter Eagle is scheduled to arrive at Berth 14 at Prince George Wharf in Nassau, Bahamas on Thursday, May 28 as part of its 2015 cadet summer training deployment.

Shipping Freight Rates Drop Amidst Overcapacity

Shipping freight rates on the world's busiest route, from Asia to Northern Europe, fell by the largest percentage amount since 2008, reflecting wild volatility

WFP: Aid Cargo for Yemen will be Delivered After Ship Docks

The World Food Programme will deliver a cargo of Iranian aid for Yemen once the ship carrying it reaches Djibouti's port, the U.N agency said on Friday. Earlier

Finance

US Funding for Air Emissions/Alternative Energy Projects

The U.S. Maritime Administration (MARAD) announced that up to $1.3 million in Federal funding is now available through cooperative agreements for projects supporting

WCI Applauds Increased USACE Funding

Today WCI applauded the leadership of Senate Appropriations Committee Chairman Thad Cochran (R-MS) and Senate Energy & Water Development (E&WD) Appropriations Subcommittee

Shipping Freight Rates Drop Amidst Overcapacity

Shipping freight rates on the world's busiest route, from Asia to Northern Europe, fell by the largest percentage amount since 2008, reflecting wild volatility

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1339 sec (7 req/sec)