EB Awarded $29.8m Contract Modification

Thursday, June 28, 2007
Electric Boat Corporation, Groton, Conn., is being awarded a $29,817,354 modification to previously awarded cost-plus-fixed-fee contract (N00024-96-C-2100) to accomplish the maintenance, repair, alterations, testing, and other work on USS Texas (SSN 775) during its scheduled Post Shakedown Availability (PSA). Work will be performed in Groton, Conn., and is expected to be completed by February 2008.Contract funds will not expire at the end of the current fiscal year. The Supervisor of Shipbuilding Conversion and Repair, Groton, Conn., is the contracting activity.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Østensjø Rederi Orders Another Wind Farm Vessel

Rolls-Royce has signed a contract with shipyard Astilleros Gondan in Spain to design and equip a second Service Operation Vessel for ship owner Østensjø Rederi.

Prosafe Appoints Interim Chairman of the Board

Prosafe, owner and operator of semi-submersible accommodation vessels, informs that its Chairman, Harald Espedal, has notified the company that he will step down

Kongsberg Tech for Peruvian Arctic Research Vessel

Kongsberg Maritime has been chosen to deliver an integrated subsea technology systems package including two HUGIN Autonomous Underwater Vehicles (AUV) for a new

Navy

Migrant Boat Capsizes, Second in Two Days

A migrant boat capsized in the Mediterranean on Thursday and about 100 of its passengers have been rescued while the number of dead is unknown, officials said.   It

Aquino: China Breaks South China Sea Deal

Philippine President Benigno Aquino on Thursday accused China of breaking a U.S.-brokered deal between the two nations on the Scarborough Shoal, an uninhabited rocky outcrop in the South China Sea.

2016 SDAP Rates Announced

The US Navy released updates to the Special Duty Assignment Pay (SDAP) for eligible enlisted Sailors in NAVADMIN 120/16, May 25. The SDAP program enhances the Navy's ability to size,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Electronics Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0818 sec (12 req/sec)