EB Wins Navy Funds

Friday, May 16, 2008

Electric Boat Corp., Groton, Conn., is being awarded a $38,031,795 cost-plus-fixed-fee modification to the previously awarded contract (N00024-96-C-2100) for the execution of the USS Hawaii (SSN 776) Post Shakedown Availability (PSA) to include the maintenance, repair, alterations, testing, and other work. Work will be performed in Groton, Conn., (99 percent); Quonset Point, R. I., (1 percent), and work is expected to be completed by Mar. 2009. Contract funds will not expire at the end of the current fiscal year.   Supervisor of Shipbuilding Conversion and Repair, Groton, Conn., is the contracting activity.

Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

New Superyacht ROCKIT.IT Launched by Feadship

Feadship says it has launched the outstanding 60.35-metre motoryacht ROCK.IT. Created for an experienced owner who has chartered Feadships and appreciated the essence of the brand,

FTA Approves WSF Ferry Terminal Plans

In the latest Washington State Ferries Weekly Update, Capt. George A. Capacci, Interim Assistant Secretary WSDOT/Ferries Division briefs as follows: "FTA approves

NZ Interislander Ferry to Dry-dock in Devonport

NewZealand's KiwiRail says that the Interislander ferry Arahura has left Wellington for her scheduled bi-annual dry-docking in Devonport, having last visited Auckland in July 2012.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Port Authority Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0797 sec (13 req/sec)