EB Wins Navy Funds

Friday, May 16, 2008

Electric Boat Corp., Groton, Conn., is being awarded a $38,031,795 cost-plus-fixed-fee modification to the previously awarded contract (N00024-96-C-2100) for the execution of the USS Hawaii (SSN 776) Post Shakedown Availability (PSA) to include the maintenance, repair, alterations, testing, and other work. Work will be performed in Groton, Conn., (99 percent); Quonset Point, R. I., (1 percent), and work is expected to be completed by Mar. 2009. Contract funds will not expire at the end of the current fiscal year.   Supervisor of Shipbuilding Conversion and Repair, Groton, Conn., is the contracting activity.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

LNG-fueled Bulker Ordered from Korea

Hyundai Mipo Dockyard (HMD) has signed a contract to build a 50,000 dwt bulk carrier with ILSHIN LOGISTICS. The project is a collaboration between POSCO and ILSHIN

Broad Declines drag Baltic Index down

The Baltic Exchange's main sea freight index, tracking rates for ships carrying dry bulk commodities, fell on Tuesday on lower rates for capesize, panamax and supramax vessels.

MOL Makes Fleet-wide Migration to Fleet Xpress

Fleet Xpress will deliver data intelligence to drive smarter and greener shipping operations   26 July 2016: Inmarsat (LSE:ISAT.L), the leading provider of global

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Offshore Oil Pod Propulsion Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0545 sec (18 req/sec)