EB Wins Navy Funds

Friday, May 16, 2008

Electric Boat Corp., Groton, Conn., is being awarded a $38,031,795 cost-plus-fixed-fee modification to the previously awarded contract (N00024-96-C-2100) for the execution of the USS Hawaii (SSN 776) Post Shakedown Availability (PSA) to include the maintenance, repair, alterations, testing, and other work. Work will be performed in Groton, Conn., (99 percent); Quonset Point, R. I., (1 percent), and work is expected to be completed by Mar. 2009. Contract funds will not expire at the end of the current fiscal year.   Supervisor of Shipbuilding Conversion and Repair, Groton, Conn., is the contracting activity.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

Wood Group Bags Statoil MSA

Wood Group has been awarded an evergreen master services agreement (MSA) by Statoil to support the life cycles of its offshore  and onshore facilities. Work and

Russian Shipbuilder Wins $1 bln Iran Oil Rig Deal

Russian shipbuilder Krasnye Barrikady has been awarded a near-$1 billion contract by Iran to build five offshore drilling rigs for use on Iran's part of the Gulf shelf,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0546 sec (18 req/sec)