Electric Boat Awarded $1.2b Submarine Contract

Friday, December 29, 2006
Electric Boat Corp., Groton, Conn., is being awarded a $1.2b modification to previously awarded multi-year contract (N00024-03-C-2101) for Fiscal Year 2007 Virginia Class Submarine (SSN 782) and Advance Procurement (AP) funding for the FY08 submarine (SSN 783). Work will be performed in Groton, Conn. (30 percent), Quonset Point, R.I. (15 percent) and Newport News, Va. (15 percent), with other efforts performed at various sites throughout the United States (40 percent). Work is expected to be completed by April 2014. Contract funds will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

$55M Berth Upgrade in Townsville Port

Townsville contractor CivilPlus Constructions has been awarded the design and construct tender for the primary wharf works component of Port of Townsville’s $55 million Berth 4 Upgrade project.

Aker Joins Johan Sverdrup Phase 2 Study

Aker Solutions will deliver a concept study on a new processing platform for future phases of the Statoil-operated Johan Sverdrup North Sea field, Norway's largest oil find in three decades.

GTT, DSME Ink Cooperation Deal

GTT, the world leader in the design of membrane containment systems for the maritime transportation and storage of LNG (Liquefied Natural Gas) announces the signature

 
 
Maritime Careers / Shipboard Positions Naval Architecture Offshore Oil Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0720 sec (14 req/sec)