Environmentally Sensitive Drilling Solutions

Wednesday, December 30, 2009
Photo courtesy Statoil

Statoil is the first operator in the U.S. Gulf of Mexico to adopt the Riserless Mud Recovery (RMR) system that reduces discharges to sea. This environmentally sensitive drilling solution has been used on the Discoverer Americas drill ship on the Statoil-operated Krakatoa prospect.
 
"The RMR system allows us to circulate the mud, reducing the total mud consumption and discharges to sea to a quarter of the amount compared with conventional methods," explained Tore Grønås, Statoil's superintendent for the Discoverer Americas drill ship.

The cost of mud itself and the transportation of it to the drill ship are significantly reduced.

"In addition, this technology allows us to push the drilling depth deeper for the shallow casing string, which again reduces the overall drilling time per well,” he said.
 
“Minimizing the number of casing strings down to the reservoir is crucial for the success, especially within deepwater drilling where you may run out of options. With RMR technology, we have the opportunity to reduce the required number of casing strings and thereby reduce the total well cost by several of million US dollars," he added.
 
Statoil currently has two drilling units in operation in the Gulf of Mexico. RMR technology has successfully been used by Statoil on the Norwegian Continental Shelf in 19 operations over the past years.

The RMR system has been qualified and field proven down to water depths of 5000 ft.The RMR technology is currently being tested and qualified to be used in even deeper waters, allowing the technology to be used in much of the Gulf of Mexico. RMR technology is used prior to installing the drilling riser, in other words, at the start of the well.  Statoil still has several months of drilling on the prospect before reaching the reservoir.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Odfjell Drilling in Tighter 2Q North Sea Market

Odfjell Drilling reports second quarter 2014 financial results showing a profit of US$29-million. Profit & loss Q2 2014 Operating revenue for Q2 2014 was USD 272 million (USD 289 million),

Brazil AHTS Contract Breakthrough for Havyard

Havyard says it is to deliver the ship design and equipment for four anchor handling tug supply (AHTS) vessels that are to be built and operated by the Brazilian

EOC Takes Full Ownership of OSVs

On 26 August 2014, EOC Limited agreed to acquire 50% of the entire issued share capital of Lewek Antares Shipping Pte. Ltd. (the "Target") , a company incorporated under the laws of Singapore,

Environmental

BMT WBM to Showcase TUFLOW at World Bank Seminar

BMT WBM ( (BMT), a subsidiary of BMT Group Ltd, a leading international engineering and risk management consultancy, is delighted to announce that it will be presenting

Long Beach Cargo Operations Resume

Repair work begins after storm surges subsides The Port of Long Beach resumed full cargo-handling operations Thursday, Aug. 28, after a lessening of storm surges

Restoring the NY-NJ Harbor Estuary

Significant challenges often require a team effort. Restoring the New York-New Jersey Harbor Estuary is one of them. A group of professionals from the Army Corps of Engineers,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2160 sec (5 req/sec)