Erika To Be Emptied

Thursday, April 20, 2000
TotalFinaElf picked Coflexip Stena Offshore and Stolt Offshore to pump oil from the tanker Erika, which sank off France's Atlantic coast. TotalFinaElf, which has faced widespread criticism in France for the disaster, has agreed with the government to pump up to 15,000 tons of heavy fuel still believed to be trapped in the holds of the tanker. The difficult operation, involving two ships with pumps and a tanker to carry the recovered oil to the Donges refinery near Nantes, is scheduled to begin next month. It is expected to be completed in September. TotalFinaElf has estimated the cost of the operation at $57 million.
Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Tanker Trends

Tankship Owners TORM Get Credit Facility Extension

Denmark-based TORM say that all lenders have supported the agreement to extend the existing Super Senior Working Capital Facility by six months until 31 March 2015

Iraqi Kurdistan Oil Shipments Reach 8.8m Barrels

Iraqi Kurdistan has shipped 8.8 million barrels of oil from the Turkish port of Ceyhan since May, Turkish Energy Minister Taner Yildiz said, as the autonomous region

Stena, Sonangol Launch Training Facility in Angola

The Centro De Formação Maritima De Angola (CFMA) was officially launched on August 27 by top management from Sonangol, the Angolan public sector energy company and the Stena Group of Sweden.

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0888 sec (11 req/sec)