Exclusive Tug Franchise Decision Delayed

Monday, June 28, 2004
At the request of the Administrative Law Judge, the Federal Maritime Commission (FMC) has extended the time for rendering a decision in the matter relating to exclusive tug franchises on the Lower Mississippi River. The deadline for issuance of an initial decision has been extended from 1 July 2005 to 31 October 2005. 69 Fed. Reg. 35346 (HK Law)
Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

MOL Expands Container Fleet

Mitsui O.S.K. Lines, Ltd. announced today that the company has signed a deal for construction of four 20,000 TEU containerships with Samsung Heavy Industries.

Record Thames Ridership

A record 9.8 million passengers are using the River Thames‎, two years on from the launch of the Mayor's River Action Plan, it was announced today. The River Action Plan,

Tallink & Meyer Turku to Build LNG Ferry

AS Tallink Grupp and Meyer Turku Oy signed a contract for the construction of LNG powered fast ferry for Tallinn-Helsinki route shuttle operations. The dual

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1012 sec (10 req/sec)