EXMAR Orders Fourth LNGRV

Tuesday, July 05, 2005
Exmar confirms a long-term charter party with Excelerate Energy LP, the liquefied natural gas shipper and marketers based in Woodlands, Texas, of a further liquefied natural gas regasification vessel (LNGRV).

The vessel will be built by Daewoo Shipbuilding & Marine Engineering Co. Ltd (DSME) as DSME Hull No. 2254 and will be named the EXPLORER. The EXPLORER, the ownership of which will be a Exmar 80% / Excelerate Energy 20% joint venture, will be constructed using the membrane containment system together with Excelerate’s Energy Bridge™ technology and will have a capacity of approximately 150,900 m³ with delivery in the 1st quarter of 2008. Excelerate anticipates utilising this ship to deliver regasified LNG to the Gulf Gateway - the Gulf of Mexico Deepwater Port located 116 miles off the Louisiana cost and to support their recent application to construct a NorthEast Gateway - a Deepwater Port to be located offshore in Massachusetts Bay, near Boston in New England.

Energy Bridge™ is an innovative system, whereby a standard LNG vessel is customised to convert liquefied natural gas to vapour on board the ship. Then, utilising proven buoy technology that has been successfully deployed for more that a decade in the harsh North Sea environment, the gas flows through lines connected to the ship and linked to underwater pipelines located offshore.

The Energy Bridge system can be deployed virtually anywhere in the world to meet incremental demand for natural gas and it was successfully proven in March of this year when the first LNGRV vessel, the EXCELSIOR discharged LNG into the Gulf Gateway Deepwater Port.

With this further order, the Energy Bridge™ operation will comprise 4 LNGRV's including the EXCELSIOR, which delivered in January of this year, the EXCELLENCE, which delivered in May of this year, and DSME Hull No. 2237, to be named EXCELERATE, due for delivery in October 2006.

Exmar is one of the largest independent operators of gas tankers in the world, presently with a diversified fleet of 65 ships ranging from 150,900 m³ LNG carriers down to 3,200 m³ pressurised LPG carriers.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Zamakona, Finnish GS-Hydro Ink Deal

The presentation ceremony of the Finnish multinational leader in water services GS-Hydro, new partner of Zamakona Yards in Canarias was held yesterday (January 29th at 7 p.

PHA Budgets $ 275 mi for Capital Improvements

In 2015, the Port of Houston Authority has budgeted $275 million for various capital improvement projects. About $184 million is being allocated to its container

Imabari to Build 20,000TEU Containerships

Imabari Shipbuilding Co., Ltd. announced it has secured newbuild orders with the cooperation of Marubeni Corporation for 11 units of 20,000TEU Ultra-Large Container Carriers,

Cruise Ship Trends

31st Edition of Cruise Shipping Miami

Cruise Shipping Miami 2015 is gearing up to offer the most comprehensive and robust roster of panel discussions featuring the industry's most knowledgeable and experienced executives.

Seabourn Names New Cruise Ships

Seabourn Encore and Seabourn Ovation will be the names of new ships joining the fleet of luxury cruise line Seabourn in late 2016 and spring 2018.  Both are part of the line's Odyssey class,

Disney's 'Frozen' Coming to the High Sea

Disney Ship is “Frozen” in Alaska. Nay...The ships are not really stuck — being “Frozen” is all about Disney’s blockbuster movie and it’s now spreading to the ships especially,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1616 sec (6 req/sec)