FERC Order re: Weaver’s Cove LNG Facility

Tuesday, July 19, 2005
The Federal Energy Regulatory Commission (FERC) issued an Order approving the request to construct and operate the Weaver’s Cove liquefied natural gas (LNG) facility at Fall River, Massachusetts. The order includes various environmental, safety, and security conditions, including compliance with U.S. Coast Guard requirements relating to maritime security, vessel operations, and emergency response planning. (HK Law)
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

Crowley’s 2nd LNG ConRo Ship Ahead of Schedule

Shipbuilder VT Halter Marine, Inc. announced construction has started early for the second liquefied natural gas (LNG)-powered ConRo ship, Taíno, for Crowley Holdings, Inc.

Hoegh LNG's Bond Issue

Hoegh LNG (HLNG) has successfully completed the issuance of a USD 130 million senior unsecured bond in the Nordic bond market with maturity date expected to be 5 June 2020.

Fluxys LNG Launches Zeebrugge Capacity Consultation

Belgian gas infrastructure operator Fluxys said on Thursday it was launching a market consultation to assess demand for additional capacity at the Zeebrugge liquefied natural gas terminal in Belgium.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Pod Propulsion Salvage Ship Electronics Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1030 sec (10 req/sec)