FERC – Weaver’s Cover Offshore Berth Project

Wednesday, June 11, 2008

The Federal Energy Regulatory Commission (FERC) issued a notice stating that it is evaluating the Offshore Berth Project planned by Weaver’s Cove Energy. The plan calls for construction of a berthing facility in Mount Hope Bay, approximately one-mile southwest of Brayton Point in Somerset, Massachusetts, with pipelines connecting the berthing facility with the previously authorized liquid natural gas (LNG) facility in Fall River. Public scoping meetings will be held in , (June 24) and (June 25). Written comments should be submitted by July 7.

source: HK Law

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

USCG Leadership Development Center Change of Command

The Coast Guard’s Leadership Develop Center will have its first change of command ceremony Thursday, July 31 at 11 a.m. in front of Yeaton Hall at the U.S. Coast Guard Academy in New London, Conn.

6 MW Offshore Wind Turbine of Siemens Certified

Siemens Energy has obtained type certification of DNV GL for the company's innovative D6 offshore wind turbine. The model Siemens SWT-6.0-154 is equipped with a modern direct drive generator,

Turkey Approves EIA Report for South Stream’s Offshore Section

The Ministry of Environment and Urban Planning of Turkey approved the Environmental Impact Assessment (EIA) Report and issued a positive opinion of the EIA results

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0670 sec (15 req/sec)