FERC – Weaver’s Cover Offshore Berth Project

Wednesday, June 11, 2008

The Federal Energy Regulatory Commission (FERC) issued a notice stating that it is evaluating the Offshore Berth Project planned by Weaver’s Cove Energy. The plan calls for construction of a berthing facility in Mount Hope Bay, approximately one-mile southwest of Brayton Point in Somerset, Massachusetts, with pipelines connecting the berthing facility with the previously authorized liquid natural gas (LNG) facility in Fall River. Public scoping meetings will be held in , (June 24) and (June 25). Written comments should be submitted by July 7.

source: HK Law

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

Shepler’s New Ferry Takes Shape

Sparks are flying on the bulkhead and engine room of the $3.8 million, 85-foot Miss Margy, the newest addition to the Shepler’s Mackinac Island Ferry fleet, at Moran Iron Works.

LEEVAC Launches First PSV for Tidewater

On Tuesday, January 27, LEEVAC Shipyards Jennings, LLC launched hull 367, a platform supply vessel (PSV) designed by LEEVAC Design Services, LLC (300 DE-52 HAB PSV).

Puget Sound Container Volumes Flat in 2014

Container volumes through Puget Sound’s largest container ports remained flat in 2014, according to numbers released jointly for the first time by the ports of Seattle and Tacoma.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Pod Propulsion Port Authority Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1142 sec (9 req/sec)