FGH Tries To Shed Petrodrill Contracts

Monday, May 07, 2001
Friede Goldman Halter filed with the bankruptcy court a motion to reject the two contracts for the construction of the two Amethyst offshore drilling rigs for Petrodrill. The company, in a statement, said that these highly unprofitable contracts caused substantial losses to FGH, and led to the company's recent Chapter 11 filing. FGH has also taken further cost-cutting measures, announcing that all senior management members have taken substantial salary cuts, in come cases as high as 40%.
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Japan Military Wants China "Crisis Management" Pact

Japan's highest-ranking military officer on Friday urged an early start to a "crisis management" mechanism with China amid conflicting claims to a group of tiny East China Sea islands.

Wärtsilä Integrated Solutions for Maersk's AHTS Vessels

A new series of six Anchor Handling Tug Supply vessels to be built at the Kleven Verft AS in Norway for the Danish based Maersk Supply Service A/S - part of the A.

Fourth Rig Delivered to Perforadora Central

Keppel AmFELS LLC, a wholly owned US subsidiary of Keppel Offshore & Marine Ltd (Keppel O&M), has delivered the jackup rig, Coatzacoalcos, to Mexico’s Central Panuco S.

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0952 sec (11 req/sec)