Fire Reported on Shell Facility

Thursday, November 29, 2007
A small fire broke out on Shell's North Cormorant platform, which was quickly extinguished. Reports indicated that there was no need for any of the 106 staff to be evacuated from the North Sea facility. The blaze in the turbine hood of a water injection pipe comes just three days after 113 staff had to be taken off the Petrofac-run Thistle Alpha platform, which suffered a three level fire on Sunday morning.

Problems arose on North Cormorant, which is 109 miles northeast of Shetland but the platform's fire protection system sprung into action, and normal service resumed just 15 minutes later. Reports said that Shell will send a team out to probe the incident, and the UK's Health and Safety Executive (HSE) will investigate. Source: Energy Current

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Highest-Pull Wireline Conveyance System from Schlumberger

Schlumberger announced today the launch of the MaxPull high-pull wireline conveyance system that can pull from 18,000 lbf to 30,000 lbf in wells 40,000 ft [12,192 m] deep or more.

Cyberhawk Sinks Claws into US O&G Market

Cyberhawk Innovations, the world leader in aerial inspection and survey using Unmanned Aerial Vehicles (UAV), is set to boost its international credentials with

DNS Appoints Esson, Chief Executive

Decom North Sea (DNS), the representative body for the offshore decommissioning industry, which promotes and facilitates collaboration and cost reduction, today appointed a new chief executive.

Maritime Security

Islamic Militants Free Indonesian Sailors

Ten Indonesian tugboat crewmen held by the Abu Sayyaf terror gang in the southern Philippines were freed unharmed Sunday.   The sailors arrived in Jakarta late on Sunday night,

India to Take Part in Maritime Drill in South China Sea

India will join US and Japan conduct joint naval exercises in the northern waters of the Philippine Sea, an area close to the East and South China Seas where Beijing

Indian Sub Kalvari Undergoes Sea Trials

‘Kalvari’ (Tiger Shark), the first of the Scorpene-class submarines, went to sea for the first time on Sunday marking the commencement of sea trials.    The

 
 
Maritime Contracts Maritime Standards Navigation Offshore Oil Pod Propulsion Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0791 sec (13 req/sec)