Fireboat Delivered to Port of Los Angeles

Thursday, March 27, 2003
The Los Angeles Fire Department has accepted its new fireboat which is en route from Freeland, Wash. to its homeport. The fireboat left March 21, and is expected to take 5 to 6 days. This voyage is the culmination of an eight year long process to create a new generation of marine fire-fighting capability in Los Angeles. Built over an eighteen month period (started on September 11, 2001) by Nichols Brothers Boat Builders of Freeland, the new fireboat was designed by Robert Allan Ltd. of Vancouver, BC.
Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

MOL, Mitsui Ink Charter Deal

Mitsui O.S.K. Lines, Ltd. signed a contract with Mitsui & Co., Ltd. today (January 29) to charter a new 177,000m3 liquefied natural gas (LNG) carrier. This

MHI Wins LNG Order

Mitsubishi Heavy Industries, Ltd. (MHI) has received an order for two next-generation LNG (liquefied natural gas) carriers from Mitsui & Co., Ltd. The carriers

Shepler’s New Ferry Takes Shape

Sparks are flying on the bulkhead and engine room of the $3.8 million, 85-foot Miss Margy, the newest addition to the Shepler’s Mackinac Island Ferry fleet, at Moran Iron Works.

 
 
Maritime Security Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0963 sec (10 req/sec)