Floating Concept Testing for Offshore Wind Farms

Thursday, November 10, 2005
The major limitation in offshore wind farms tapping the stronger, more consistent winds that lie farther out is the depth required to install the footing for the turbine foundations. The Norway-based company Hydro is developing a new concept that would use floating concrete construction technology developed for the North Sea oil industry and apply it to offshore wind turbines, according to Renewable Energy Access reports. Dubbed "Hywind," model testing is currently under way at Norwegian R&D institute Sintef Marintek's ocean basin laboratory in Trondheim. Hydro is using the ocean basin in Trondheim to simulate wind and wave conditions at sea. The company is now evaluating the placement of a wind turbine in the North Sea to demonstrate that it is possible to build offshore wind parks at sea depths of 200-300 meters. The company emphasizes that Hywind will be a supplement, not a substitute to land-based wind parks, according to the report. According to plans, the demonstration project will start operating in 2007. They eventually envision wind turbines with a power capacity of 5 MW and a rotor diameter of approximately 120 m. Hydro has invested approximately $3 million into developing the Hywind concept over the past three years. Further realization of research and the demonstration project will require at least another $23 million. Source: Renewable Energy Access Online

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Conrad Shipyard Forms LNG Business Unit

Conrad Shipyard has formed a new business unit focused on LNG projects.   Conrad, builder of North America’s first LNG bunker barge scheduled for 2017 delivery,

Prince Charles Places Final Section of UK Aircraft Carrier

The second of the largest warships ever built for the U.K. Royal Navy, the Queen Elizabeth Class carrier HMS Prince of Wales, was given the royal seal of approval when HRH The Prince of Wales,

New Zealand: Maritime Trade is Key

Globally, shipping is on the rise – already 80-90 percent of the world’s trade is by ship; that is more than 12 billion metric tons of goods annually, shipped by 1.

Offshore

US Oil Drillers Cut Rigs after 3 Weeks of Additions

U.S. oil drillers cut rigs this week for a 20th week this year after three weeks of additions, according to a closely followed report on Friday, as crude prices

Subsea 7 Announces PLSV Swap off Brazil

Subsea 7 S.A. said it has reached an agreement with Petrobras to substitute a pipelay support vessel (PLSV) working off Brazil.   The agreement will see the Subsea-7-owned

FPSOs Sit Unprecedentedly Idle

While the oil and gas markets are starting to come to life, nearing the $50 per barrel mark, the future fate of floating production remains a mystery   The 20

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1025 sec (10 req/sec)