Floating Concept Testing for Offshore Wind Farms

Thursday, November 10, 2005
The major limitation in offshore wind farms tapping the stronger, more consistent winds that lie farther out is the depth required to install the footing for the turbine foundations. The Norway-based company Hydro is developing a new concept that would use floating concrete construction technology developed for the North Sea oil industry and apply it to offshore wind turbines, according to Renewable Energy Access reports. Dubbed "Hywind," model testing is currently under way at Norwegian R&D institute Sintef Marintek's ocean basin laboratory in Trondheim. Hydro is using the ocean basin in Trondheim to simulate wind and wave conditions at sea. The company is now evaluating the placement of a wind turbine in the North Sea to demonstrate that it is possible to build offshore wind parks at sea depths of 200-300 meters. The company emphasizes that Hywind will be a supplement, not a substitute to land-based wind parks, according to the report. According to plans, the demonstration project will start operating in 2007. They eventually envision wind turbines with a power capacity of 5 MW and a rotor diameter of approximately 120 m. Hydro has invested approximately $3 million into developing the Hywind concept over the past three years. Further realization of research and the demonstration project will require at least another $23 million. Source: Renewable Energy Access Online
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Info-X Invests in $5m Headquarter Expansion

Transportation solutions provider capitalizes on outsourcing trend Info-X Software Technology, provider of software solutions and back-office support to U.S.

Daihatsu Joins ClassNK Research Project

Classification society ClassNK announced that it will embark on a joint research project together with Daihatsu Diesel Mfg. Co., Ltd. Through the partnership, ClassNK

Ecospeed Fuel and Cost Saving Solutions at SMM

Ecospeed announced it will exhibit its line of fuel and cost saving solutions at SMM in Hamburg. Ecospeed and fuel savings Routine in-water cleaning results

Offshore

OSV Power

The continued maturation of Offshore Service Vessel design is embodied in recent contracts and deliveries.  Ulstein Verft subsea newbuild Island Performer was

Lamprell First Half Results Beat Expectations

Lamprell today announced its financial results for the first half of 2014, reporting results ahead of expectations due to strong operational performance and early results from savings initiatives,

Kongsberg to Supply FPSO Safety System

Kongsberg Maritime Engineering (KME), the wholly owned Engineering, Procurement and Construction (EPC) subsidiary of global maritime technology developer Kongsberg Maritime,

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Pipelines Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2333 sec (4 req/sec)