FMC Grants Extension to Canaveral Port Authority

Thursday, August 01, 2002
The Federal Maritime Commission (FMC) has granted an extension until August 8, 2002 to Canaveral Port Authority relating to its filing of rebuttal affidavits and memoranda of law with respect to alleged unreasonable refusal to deal or negotiate in violation of the Shipping Act of 1984. Source: HK Law
Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Kalmar to Upgrade MSC Terminal VLC (Valencia) Cranes

Kalmar, part of Cargotec, has announced a large contract to heighten and extend the handling capabilities of eight ship-to-shore (STS) cranes at MSC Terminal VLC in Valencia, Spain.

DP World Plans Big for the Panama Canal

DP World is expanding its container terminal at Port of Caucedo following the expansion of the Panama Canal to accommodate larger container ships, reports ASC.

Adani Ports, L&T Ink Pact for Kattupalli Port Operations

Adani Ports  has entered into a non-binding Memorandum of Understanding with L&T Shipbuilding Limited (L&T) for evaluating the operations of the port at Kattupalli,

Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0846 sec (12 req/sec)