Four-Ship Boost for Diamond 53 Double Hull

Wednesday, September 25, 2002
A Consortium led by the U.K.-based Graig Group and its China-based subsidiary have given a major boost to the Diamond 53, a new, future-proof double-hull ultra-handymax bulk carrier design, by signing a letter of intent to build four vessels, with four options, at CSIC yards in China. Delivery of the first of a series of Diamond 53 type vessels is scheduled for 2004. "Double hull bulk carriers are the way forward," says Hugh Williams, ceo of Graig. "The Diamond 53 design developed over the past 12 months offers owners and charterers major operational cost savings, while significantly enhancing safety and environmental protection. The design features ensure that the vessel will exceed any future standards which come out of the studies into bulk carrier safety which IMO and IACS are currently conducting. Given our experience of successfully building over 25 vessels for a range of prominent shipowners building in China, and the excellent financial package we have developed for this design, we are very confident that the Diamond 53 will give us a competitive advantage in what is a changing and demanding market place." The Diamond 53 ultra-handymax double-hull bulk carrier design has been developed jointly by Graig and Denmarks' Carl Bro, with whom Graig has a joint venture design company based in Shanghai. Whilst the vessel has been designed with very much the future in mind, it is firmly based on operational experience both from owners and class. The vessels will be classed with DNV: - DnV +1A1 Bulk Carrier with full Nauticus package including a full 3-D model. The first series of ships are intended to be built at Bohai and other nominated CSIC Shipyards in northern China. Graig China's experienced Shanghai-based supervision teams will oversee the building. Diamond 53 is a geared, wide-hatched, 53,000 dwt handymax bulk carrier with double hull. The vessel has 5 cargo holds, equipped with end-folding hydraulically operated hatch covers and four 36 tonne electro-hydraulic luffing cranes.
Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Wärtsilä to Proceed with first LNG Terminal

Wärtsilä has been given full notice to proceed (NTP) from Manga LNG Oy for the supply of a liquefied natural gas (LNG) import terminal in Tornio, Northern Finland.

Port of Galveston to Repair Public Pier

Galveston Wharves’ board of trustees today unanimously approved a project to repair pilings and pier deck in the Pier 19 area of the port. The board awarded the contract,

NASSCO Cuts Steel on APT "ECO Tanker"

General Dynamics NASSCO started construction of another ship in its commercial shipbuilding backlog, starting construction of a second “ECO” tanker to be built

 
 
Maritime Security Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1363 sec (7 req/sec)