Four Times 500 HP for Colombian River

Monday, August 24, 2009

The Rio Magdelena flows north through Colombia to discharge into the Caribbean at Barranquilla. It is navigable for several hundred kilometers above that coastal city. Utilizing shallow draft push boats the Naviera Fluvial Colombiana SA has the capacity to move one million tonnes of oil per year in addition to 700,000 tonnes of general freight. Established in 1920 the firm operates a dozen river push-boats and 78 barges on Colombias inland waterways.
 
Naviera is the only Colombian river transport company with its own shipyard. At this facility in Barranquilla, at the mouth of the Rio Magdelena, they are able to build and maintain their fleet. Recently, the firm undertook a major refit and repower of their big towboat Sotara. Previously committed to a competitor’s engines, the company spent several months analyzing the operation cycle, fuel consumption and maintenance costs before deciding on Cummins engines.  In order to maintain a shallow draft with adequate horsepower they chose to install four Cummins KTA19-M3 engines each rated for 500 hp at 1800 RPM. The engines were purchased from Cummins de Los Andes, the distributor for Colombia.
 
With a length of 131.2 ft, the push boat carries a beam of 39.4 ft, which allows ample space for mounting the four engines, and helps maintain the 6.5-ft draft.  Cummins Andes application engineer Alfredo Cardenas worked extensively with Naviera Fluvial engineers on the successful installation of the Sotaras new heat exchanger-equipped, turbo-charged and after-cooled engines.

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

WEG to Showcase Drive Solutions at SMM

WEG, a global supplier of drive systems, will showcase its range of systems for the shipbuilding and offshore industry at this year’s SMM (Shipbuilding, Machinery & Marine Technology Fair) in Hamburg.

Scottish Sea Farms Takes New Vessel Delivery

Scottish Salmon Farms has taken delivery of its latest vessel – powered by twin Doosan V158TIH main engines supplied by WaterMota.   Designed by consultant naval

There’s Still Time for SHIPPINGInsight Award Entries

Entry submissions for the first SHIPPINGInsight Award are due Friday, Aug. 1, but organizers said they will continue to accept nominations through following week to provide some extra time.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1844 sec (5 req/sec)