Fourth GPA-designed PSV Delivered

Thursday, January 19, 2006
Guido Perla and Associates (GPA), announced the delivery of the M/V Hector, the fourth of ten GPA 670 Platform Support Vessels (PSV) designed by the company for Bourbon Offshore of Marseille, France, a division of Bourbon. The M/V HECTOR marks the last of four vessels originally ordered by Bourbon Offshore, who has expanded the GPA 670 building program to a total of 10 vessels, which will be built at Zhejiang Shipbuilding in Ningbo, China. The GPA 670 PSVs are 240-ft diesel-electric vessels, which are equipped with two stern-mounted Kawazaki KST-200 360 degree azimuthing Z-drive, fixed pitch, 1,200 rpm powered, full range variable speed motors. A further enhancement to the diesel-electric drives is the dynamic positioning system and the vessel management. The GPA 670 vessel is capable of carrying 9,005 cu. ft. of bulk material and 6,868 barrels of liquid mud in self cleaning oval tanks. The vessels’ pumps deliver mud to a height of 197 ft. above water. The 80-PSI air compressors can also deliver 50 metric tons of dry cement or barite per hour to the same height.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

Ship of the Year Award for NYK Vessel

Japan's first LNG-fueled ship, Sakigake, which is a tugboat owned by NYK has been recognized with a Technology Special Award at the 2015 Ship of the Year Awards

First U.S. LNG shipment to cross expanded Panama Canal

The United States will ship its first liquefied natural gas (LNG) cargo through an expanded Panama Canal next week.   The waterway shaves distances between export

GTT Cuts Outlook on Ship Construction Delays

French supplier of systems for marine transportation of liquified natural gas (LNG) Gaztransport & Technigaz (GTT) reported strong growth in its first half results

Vessels

Ithaca’s FPF-1 platform to be moved to Stella field

Ithaca Energy Inc. reports that the "FPF-1" floating production facility has completed the required inclination test as planned and departed the Remontowa shipyard in Gdansk, Poland.

Live Fish Carrier Launched at Gondan

At high tide, the vessel “MARTIN SÆLE”, the first Live Fish Carrier built by Gondan Shipyard in Figueras, was successfully launched today. Representatives of the owner of the vessel,

GTT Cuts Outlook on Ship Construction Delays

French supplier of systems for marine transportation of liquified natural gas (LNG) Gaztransport & Technigaz (GTT) reported strong growth in its first half results

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0705 sec (14 req/sec)