Garfitt Joins Elliott Bay Design Group

Monday, May 20, 2002
Seattle-based Elliott Bay Design Group announces the addition of John Garfitt to its marine engineering team. John has over 10 years of marine engineering experience and has worked on projects all over the world. As a senior marine engineer, John is involved in the Repower Study for the M/V COLUMBIA and will be lending his expertise to the Pierce County Waterborne Transportation Study. John is a licensed professional engineer in Canada and is currently working toward his U.S. license. Prior to joining EBDG, John served as vice president for Queenship Yachts and worked with BC Ferries.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Baltic Mercur II makes maiden voyage to Antwerp

This week Atlantic Ro-Ro Carriers (ARRC) celebrates the maiden voyage of the Baltic Mercur II via the port of Antwerp as part of their regular transatlantic service to the US Gulf.

USCG Provides Safety Tips to Paddlesports Enthusiasts

As the boating season unofficially begins, the 9th Coast Guard District is reminding paddlesport enthusiasts to take precautions to ensure safe trips and increase

USS George Washington Completes Carrier Qualifications

Carrier Air Wing (CVW) 5 and the Nimitz-class aircraft carrier USS George Washington (CVN 73) completed its carrier qualifications (CQ), May 23. CQ allows

Shipbuilding

DNV GL’s Synergi to Manage Siem Offshore Newbuilding Projects

Siem Offshore has chosen DNV GL’s Synergi Project to manage nine newbuilding projects. Synergi Project software The software is used to optimize the collaboration

Bahri Inks Contracts with Hyundai to Build 5 VLCCs

The National Shipping Co. of Saudi Arabia (Bahri) signed contracts on Thursday with Hyundai Samho Heavy Industries (HSHI) to build five very large crude carriers (VLCCs),

USS George Washington Completes Carrier Qualifications

Carrier Air Wing (CVW) 5 and the Nimitz-class aircraft carrier USS George Washington (CVN 73) completed its carrier qualifications (CQ), May 23. CQ allows

 
 
Maritime Standards Navigation Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1297 sec (8 req/sec)