GE Gets USN Certification for LM2500+

Thursday, August 05, 2004
GE Transportation's marine business received United States Navy certification for its LM2500+ aeroderivative gas turbine. The LM2500+ has been certified by the U.S. Navy for 35,000 brake horsepower (bhp) for mechanical drive applications. The LM2500+ received the certification for use powering the U.S. Navy's eighth LHD and follow-on ships in the WASP (LHD 1) class of large-deck, multipurpose amphibious assault ships.

"The LHD 8 will be the first military application of the LM2500+, and we are very pleased with the achievement of this major milestone in the history of the LM2500 engine family. We believe the LHD program will pave the way for the use of the LM2500+ for a variety of future domestic and international naval programs," said Karl Matson, general manager, GE Transportation's marine business.

During the 500-hour testing regimen conducted at the GE Evendale, Ohio manufacturing facility, no engine forced shutdowns were experienced. Other aspects of the test program included:

-- Engine was maneuvered from idle to full power;

-- 35% of the time the engine ran at 100% power;

-- Engine ran to internal temperatures associated with 100oF ambient temperatures (a standard Navy day);

-- Test emphasized cyclic stresses and high temperature effects; and

-- Test was followed by disassembly and inspection of major subassemblies.

The LHD 8 is being built by Northrop Grumman Ship Systems, Pascagoula, Miss., and will be powered by two GE LM2500+ gas turbines, coupled with GE main reduction gearing.

GE has supplied nearly 90% of the U.S. Navy's hardened and ground gearing for various applications over the past 20 years. The gearboxes for the LHD 8 were built at GE's state-of-the-art Lynn, Mass. plant. The LM2500+ gas turbines were manufactured at GE's Evendale facility.

The ship's hybrid electric drive system will have electric motors to provide propulsion power at low loitering speeds. The previous seven LHD ships, also designed and built by Northrop Grumman Ship Systems, were powered by steam propulsion systems. GE also supplied the last three ships' main reduction gears.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Pollet to Lead R&D at Coldharbour Marine

Coldharbour Marine Ltd. has appointed Professor Bruno Pollet to head its R&D department.   Bruno Pollet moves to Linby, Nottinghamshire from the University of the Western Cape,

ClassNK Opens R&D Center in Singapore

Classification society ClassNK promoted the activities of its new Global Research and Innovation Center (GRIC) at a press conference held today in Singapore.   Joined

ABS Appoints New Chief Technology Officer

ABS named Howard Fireman as Senior Vice President and Chief Technology Officer (CTO) effective April 20 in a move that strengthens alignment and generates further

Marine Propulsion

Pollet to Lead R&D at Coldharbour Marine

Coldharbour Marine Ltd. has appointed Professor Bruno Pollet to head its R&D department.   Bruno Pollet moves to Linby, Nottinghamshire from the University of the Western Cape,

Vane Brothers Welcomes Latest Tug Newbuild

The Vane Brothers Company, a marine transportation provider headquartered in Baltimore, has taken delivery of Kings Point, the latest in a wave of Maryland-built tugboats.

Towboat Delivered to Tidewater Transportation & Terminals

Tidewater Transportation & Terminals takes delivery of new towboat Crown Point from Vigor Industrial to be deployed in Tidewater’s Columbia and Snake River service

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1926 sec (5 req/sec)