GE Marine Engines Powers Brilliance of the Seas

Wednesday, July 31, 2002
GE Marine Engines announced that a GE LM2500+ combined gas turbine and steam turbine integrated electric drive system (COGES) plant powers Royal Caribbean International's Brilliance of the Seas cruise ship which recently made its maiden voyage. The Brilliance of the Seas will sail in Europe, the United States, Canada and the Caribbean. The 962-foot long ship has a passenger capacity of 2,100, is of 90,090 gross tonnage and has a cruising speed of 25 knots. Currently there are a total of six cruise ships in operation that use GE's LM2500+ COGES plant: two Royal Caribbean ships - Brilliance of the Seas and Radiance of the Seas -- and four Celebrity Cruises ships - Millennium, Infinity, Summit and Constellation. The COGES arrangement on each ship features two GE LM2500+ gas turbine-generators and one steam turbine-generator set for a total output of 59 megawatts. This electric drive configuration provides for both main ship propulsion as well as all onboard power generation. To date, the 12 LM2500+ gas turbines aboard the six ships have accumulated 75,000 hours in service. The COGES arrangement is a very efficient use of energy. Energy that otherwise would be lost in the gas turbine exhaust is captured by heat recovery steam generators to produce steam for steam turbine electric power generation and service steam use. The LM2500+ COGES ships operate on clean distillate fuel to significantly reduce emissions of most airborne pollutants and other particulates, as compared to a diesel electric power system operating on heavy fuel oil, which is customary for most cruise ships.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

ABB's 25th Year in Dubai

ABB Turbocharging is celebrating its 25th anniversary in UAE. Established in 1989 in Dubai, ABB has grown to become a fully-fledged service station capable

Moore Stephens Expects Vessel Operating Cost to Rise

Vessel operating costs are expected to rise by almost three per cent in both 2014 and 2015, according to a new survey by international accountant and shipping consultant Moore Stephens.

Wärtsilä Steerable Thruster Gets Class Approval

DNV-GL approved the design of the Wärtsilä WST-14 thruster, significant as approval was granted based on a thruster design that has yet to be introduced into full series production.

Navy

Navy to Commission Submarine North Dakota

The Navy will commission its newest attack submarine North Dakota, during a ceremony Saturday, Oct. 25, 2014, at Submarine Base New London in Groton, Connecticut.

US Navy CNO: Photo of the Day

Chief of Naval Operations (CNO) Adm. Jonathan Greenert receives a system update brief in the combat information center aboard the Arleigh Burke-class guided-missile

U.S. Navy Contracts 12 Rapid Response Skimmers

Kvichak Marine won a US Navy contract for 12 30-ft.Rapid Response Skimmers (RRS) for delivery over the next 18 months, with options for up to 30 additional skimmers to be delivered through 2019.

 
 
Maritime Security Navigation Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1244 sec (8 req/sec)