General Dynamics Awarded $208m for 2nd LCS

Monday, December 11, 2006
The U.S. Navy awarded a $208 million contract option to a Bath Iron Works-led team for construction of a second Littoral Combat Ship (LCS) featuring an innovative, high-speed trimaran hull. The 127-meter surface combatant ship, equipped with open architecture-based combat systems and computing environment, is scheduled for delivery to the Navy in July 2009. The original contract was awarded in July 2003. Bath Iron Works is a subsidiary of General Dynamics (NYSE: GD). The Littoral Combat Ship is a key element of the Navy's plan to address asymmetric threats of the twenty-first century. Intended to operate in coastal areas of the globe, the ship will be fast, highly maneuverable and geared to supporting mine detection/elimination, anti-submarine warfare and anti-surface warfare, particularly against small surface craft.

The General Dynamics Littoral Combat Ship will have one of the largest usable payload volumes per ton of ship displacement of any U.S. Navy surface combatant afloat today -- providing the flexibility to carry out one mission while a separate mission module is in reserve. The General Dynamics LCS's large flight deck sits higher above the water than any U.S. Navy surface combatant and will support near-simultaneous operation of two SH-60 helicopters or multiple unmanned vehicles. The ultra-stable trimaran hull allows for flight operations in high sea conditions. In addition, the deck is suitable for landing the much-larger H-53 helicopters, should that become a future requirement. The General Dynamics Littoral Combat Ship design is based on a proven Austal (Henderson, Australia) high-speed trimaran hull that is currently operating at sea. The first trimaran LCS, Independence (LCS 2), is under construction at Austal USA in Mobile, Alabama.

The General Dynamics Littoral Combat Ship's open architecture computing environment -- another key factor in meeting the U.S. Navy's requirements for a flexible, multimission ship -- enables industry's most capable, affordable, non-proprietary solutions to be incorporated into the ship's core mission system. This computing environment, developed by the General Dynamics Advanced Information Systems team, provides a highly flexible information technology backbone that allows "plug and play" integration of both the core systems and the LCS mission modules. It meets Navy open architecture requirements, strictly adheres to published industry standards and facilitates the integration of commercially available products. It allows for future growth and seamlessly integrates domestic and foreign combat components to create a core mission system solution that dramatically lowers acquisition and lifecycle costs.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

President Pryor Retires from ExxonMobil Chemicals

Stephen D. Pryor, president, ExxonMobil Chemical Company and vice president of Exxon Mobil Corporation, has elected to retire on January 1, 2015, after more than 44 years of service.

Maritime Safety

USCG Assist Duck Hunters Near Harrington Beach Park

The Coast Guard and the Port Washington and Cedar Grove Fire Departments came to the assistance of two duck hunters on Lake Michigan Friday. The names of those involved are not being released.

HMAS Success Deploys to Middle East

After months of preparation, HMAS Success departed Garden Island in Sydney today for a six-month deployment to the Middle East Region to provide logistic support

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

 
 
Maritime Contracts Maritime Security Maritime Standards Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1786 sec (6 req/sec)