General Maritime Announces Delivery of Suezmax Newbuilding

Thursday, March 02, 2006
General Maritime Corporation to take delivery of the Genmar Harriet G, a 150,000 dwt double-hull Suezmax newbuilding. The company expects to receive delivery of the Genmar Kara G in October 2006, with its third newbuilding expected to be delivered in third quarter of 2007 and the fourth newbuilding in the first quarter of 2008.
Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Hofste, Montijn Nominated to Supervisory Board Fugro

Fugro N.V. announces that the Supervisory Board of Fugro nominates Mrs. P.H.M. Hofsté and Mrs. A.H. Montijn for appointment as members of the Supervisory Board

Oil Platform Ablaze in the Gulf of Mexico

Fire broke out on an unmanned oil platform in the Gulf of Mexico approximately five miles south of Port Fourchon, La., the Bureau of Safety and Environmental Enforcement (BSEE) reported.

Subsea Crane Takes a Long Journey

Last September the test bed in Rostock was the stage of a single lift of the RL-K 7500 subsea crane. The same crane was then loaded and shipped to the South Korean customer.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1138 sec (9 req/sec)