General Maritime Announces Delivery of Suezmax Newbuilding

Thursday, March 02, 2006
General Maritime Corporation to take delivery of the Genmar Harriet G, a 150,000 dwt double-hull Suezmax newbuilding. The company expects to receive delivery of the Genmar Kara G in October 2006, with its third newbuilding expected to be delivered in third quarter of 2007 and the fourth newbuilding in the first quarter of 2008.
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Fourth Rig Delivered to Perforadora Central

Keppel AmFELS LLC, a wholly owned US subsidiary of Keppel Offshore & Marine Ltd (Keppel O&M), has delivered the jackup rig, Coatzacoalcos, to Mexico’s Central Panuco S.

Woodside to Pick up Moroccan Acreage

Woodside advises that it has entered into a contract for an exclusive Reconnaissance Licence (RL) with the Office National des Hydrocarbures et des Mines, the

Strategy Can Maximize UKCS potential

Companies operating in the North Sea require a cultural shift to make the most of the its potential, according to a new report from Deloitte, the business advisory firm.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2917 sec (3 req/sec)