General Maritime Delivers Genmar Gabriel

Tuesday, January 24, 2006
General Maritime Corporation announced the delivery of the Genmar Gabriel to Seatankers Management Co. Ltd. This represents the final delivery of the 17 single-hull and double-sided vessels the Company sold for $444.5 million in October and November of 2005. With the delivery of the Genmar Gabriel, and including the four Suezmax newbuildings to be delivered between March 2006 and 2008, the average age of General Maritime's fleet will be reduced to 9 years and its entire fleet will be double-hull.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Bollinger Fourchon: 13 Years Without a Lost Time Accident

Bollinger Shipyards, Inc. announced that their Bollinger Fourchon, L.L.C. facility has worked 13 years without a lost time accident. Building on a philosophy that starts at the top,

Messer's CEO Norville Announces Retirement

Bill Heller to assume the position as Messer Cuttings Systems’ President and CEO Gary Norville started at Messer Cuttings Systems Inc. in September 1980 selling and installing cutting machines.

Rohr Dredge Continues European Expansion

Rohr International Dredge Holdings, Inc. announced that it acquired Eurl Rohr France, including its current backlog, inventory and all associated intellectual property (IPR), on July 23, 2014.

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0908 sec (11 req/sec)