Gerald R. Ford Keel Laying Ceremony

Wednesday, November 11, 2009
Photo courtesy Northrop Grumman Corporation

Shipbuilders at Northrop Grumman Corporation's (NYSE:NOC) Shipbuilding sector in Newport News, Va., signed a 15-ft banner in preparation for the upcoming keel laying ceremony for the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78). The banner will be on display at the ceremony on Nov. 14.

Susan Ford Bales, the daughter of the late President Gerald R. Ford, will serve as ship's sponsor and keel authenticator for the ceremony. Bales will authenticate the keel by chalking her initials onto a metal plate. Her initials will then be welded onto the plate.

Named after the 38th president of the United States, Gerald R. Ford (CVN 78) is the first ship of the new Gerald R. Ford class. The Ford class will continue the legacy of highly capable U.S. Navy nuclear-powered aircraft carrier ship platforms. Enhancements incorporated into the design include flight deck changes, improved weapons handling systems, and a redesigned island, all resulting in increased aircraft sortie rates. It will also include new nuclear power plants; increased electrical power generation capacity; allowance for future technologies; and reduced workload for the sailors, translating to a smaller crew size and reduced operating costs for the Navy.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Seaspan Takes Delivery of 5th 10000 TEU Containership

Seaspan Corporation announced yesterday that it accepted delivery of a 10000 TEU containership, the MOL Brightness. The new containership, which was constructed

MHI to Change Name of Group Company

Effective November 1 Mitsubishi Heavy Industries, Ltd. (MHI) will change the name of its group company in Singapore from Mitsubishi Heavy Industries Engineering & Services Private Ltd.

Petrobras P-66 Platform Module to Boost Production

The P-66 platform’s first modules, built at the Tomé Ferrostaal Consortium’s Module Plant located at the Port of Maceió, Alagoas, are now ready and loaded on the São Tomé barge.

 
 
Maritime Standards Naval Architecture Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1544 sec (6 req/sec)