Gladding-Hearn Starts Construction of New Incat

Thursday, April 15, 2004
Bay State Cruise Company ordered a 149 passenger high-speed ferry from Gladding-Hearn Shipbuilding, Duclos Corporation, for service between Boston and Provincetown, Massachusetts. The vessel has a June delivery date.

The new vessel replaces Friendship IV, built by the Somerset, Mass., shipyard in 1994, and under charter to Bay State for its Provincetown run in the summer and service in the British Virgin Islands in the winter. According to shipyard officials, the vessel will continue service in south Florida and the islands.

The new, all-aluminum ferry, designed by Incat Designs is 98 feet (29.75 m) long, 29.5 feet (9.1 m) at the beam, and draws 6 feet (1.8 m). It will be powered by a pair of Cummins KTA38M2 diesel engines, each delivering 1350 Bhp at 1950 rpm. The engines will turn twin Brutons 5-blade nickel-aluminum-bronze propellers via ZF2550 reverse-reduction gearboxes. The ferry’s top speed is expected to reach 30 knots. The new catamaran’s more modern and rounded bows are Incat’s latest development in hull design. The hulls’ lower resistance improves sea-keeping and efficiency and the shape is more suitable to a variety of trims and displacements, said shipyard president Peter Duclos. “The Friendship IV’s nearly non-stop performance in the past 10 years, from BVI to Florida to Boston, New York City and Bar Harbor, Maine, is respected in the industry. The new boat offers the same simplicity and economy, but with more modern equipment and construction. Structural improvements will save weight and the new hull design will increase the vessel’s sea-keeping and fuel efficiency. The conservatively-rated engines provide an economical balance of passenger capacity and speed.” The vessel’s seating arrangement represents a well-planned blend of both interior and exterior seating during the summer season. The single saloon will be fitted out with 120 Beurteaux seats and tables, a snack bar, and two heads. An additional eighty-six exterior seats will be located on the main and upper decks. A 120,000 btu HVAC system will heat and cool the cabin and wheelhouse.

Maritime Reporter October 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Maritime Security

Cutter Diligence to Return

The crew of the Coast Guard Cutter Diligence is scheduled to return to their homeport in Wilmington Saturday following a 45-day patrol in the Caribbean Sea. During their patrol,

China Completes lighthouses construction in disputed South China Sea

China has completed the construction of two lighthouses in the disputed South China Sea, the official Xinhua news agency reported, as tensions in the region mount over Beijing's maritime ambitions.

Singapore-issued CoCs need Revalidation

Holders of Singapore-issued certificates of competency (CoCs) need to revalidate their CoCs to meet the requirements of the 2010 Manila amendments to the International

Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Repair Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1253 sec (8 req/sec)