GlobalSantaFe Rigs Appear OK

Tuesday, August 30, 2005
GlobalSantaFe Corporation reported that it has accounted for all five of its drilling rigs that were in the direct path of Hurricane Katrina. All personnel on the five rigs were safely evacuated prior to the storm's arrival. GlobalSantaFe rigs in the path of Hurricane Katrina included the GSF Development Driller II and GSF High Island VIII, which showed no signs of damage during a preliminary aerial inspection. The GSF Celtic Sea and GSF Development Driller I were listing slightly, and crews and equipment are arriving on location today to assess the condition of the rigs. The GSF Arctic I drifted off its original location and was grounded in shallow waters near the mouth of the Mississippi River. Marine surveyors will be dispatched to determine the condition of the rig.

GlobalSantaFe evacuated 972 personnel after suspending operations on 14 rigs in the Gulf of Mexico due to Hurricane Katrina, including eight jackup rigs that were outside the direct path of the storm and the GSF C.R. Luigs drillship, which was moved from Katrina's path in advance of the storm. "Our top priority was to ensure the safety of everyone aboard our vessels, and we're grateful that our personnel were able to secure and safely evacuate our rigs with no injuries or environmental impact," said GlobalSantaFe President and CEO Jon Marshall. "We remain deeply concerned for the well- being of our off-duty personnel and for the families and friends of our co- workers adversely affected by the hurricane."

The company began re-manning its rigs this morning to assess their conditions and will provide an update when more information becomes available.

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Euronav Posts 62% Core Profit Increase

Belgian crude oil shipping group Euronav on Wednesday unveiled a 62 percent rise in first-quarter core profit as daily rates for its fleet rebounded from last year.

Modern Solutions Power Systems Conference

Thomas Alva Edison, who is considered to be one of the most prolific inventors in history, once said, “I find out what the world needs. Then I go ahead and try to invent it.

MSI Develops LNG Bunkering Safety Training

The Maritime Simulation Institute in Middletown, Rhode Island is developing a liquefied natural gas (LNG) bunkering safety training course. The first session, which is expected to begin in June,

Offshore

Offshore Oil & Gas: Brazil’s Northern Frontier

In an effort to spread out oil and gas production to other parts of the country and increase overall oil production, Brazil has finally intensified hydrocarbon

Safety the Focus as Heavy Lifting Picks Up

Modern heavy lift capabilities are crucial for safe, efficient operations offshore Heavy lift operations offshore are an awe-inspiring feat, but an operation that

Azeri Shipyard, BP Sign Vessel Construction Contract

Azeri state energy company SOCAR's shipyard and British oil major BP have signed a $378 million deal to design and build a subsea construction vessel for the Shah Deniz II gas project,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1446 sec (7 req/sec)