GlobalSantaFe Rigs Appear OK

Tuesday, August 30, 2005
GlobalSantaFe Corporation reported that it has accounted for all five of its drilling rigs that were in the direct path of Hurricane Katrina. All personnel on the five rigs were safely evacuated prior to the storm's arrival. GlobalSantaFe rigs in the path of Hurricane Katrina included the GSF Development Driller II and GSF High Island VIII, which showed no signs of damage during a preliminary aerial inspection. The GSF Celtic Sea and GSF Development Driller I were listing slightly, and crews and equipment are arriving on location today to assess the condition of the rigs. The GSF Arctic I drifted off its original location and was grounded in shallow waters near the mouth of the Mississippi River. Marine surveyors will be dispatched to determine the condition of the rig.

GlobalSantaFe evacuated 972 personnel after suspending operations on 14 rigs in the Gulf of Mexico due to Hurricane Katrina, including eight jackup rigs that were outside the direct path of the storm and the GSF C.R. Luigs drillship, which was moved from Katrina's path in advance of the storm. "Our top priority was to ensure the safety of everyone aboard our vessels, and we're grateful that our personnel were able to secure and safely evacuate our rigs with no injuries or environmental impact," said GlobalSantaFe President and CEO Jon Marshall. "We remain deeply concerned for the well- being of our off-duty personnel and for the families and friends of our co- workers adversely affected by the hurricane."

The company began re-manning its rigs this morning to assess their conditions and will provide an update when more information becomes available.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Liebherr to Deliver RTGs to Mayotte and Manila

Liebherr confirms orders for variable speed RTGs and electric RTGs. DPWorld Asian Terminals Inc. has placed an order with Liebherr Container Cranes for a further 5 RTGs at its Manila facility.

U.S. Navy Contracts 12 Rapid Response Skimmers

Kvichak Marine won a US Navy contract for 12 30-ft.Rapid Response Skimmers (RRS) for delivery over the next 18 months, with options for up to 30 additional skimmers to be delivered through 2019.

DP World Receives 1st Scheduled Vessel at New Terminal

DP World has yesterday welcomed the first scheduled vessel to call at its new Container Terminal 3 in Jebel Ali, Dubai, as it gears up to serve customers at the state-of-the-art facility.

Offshore

Rederij Groen Takes Delivery of 7-Waves

Rederij Groen’s entire SRSV fleet built by Damen Maaskant Shipyards Stellendam. Dutch offshore services company Rederij Groen has taken delivery of the 7-Waves,

New Oil Field Found in British North Sea

GDF SUEZ E&P UK Ltd and BP today announced a new exploration discovery in the UK Central North Sea. The discovery, which spans GDF SUEZ operated block 30/1f

Three Dead in Offshore Platform Accident

Three workers were killed and one is still missing after an accident at one of the offshore oil and gas platforms in the Caspian Sea in Azerbaijan, Azeri state energy company SOCAR said on Thursday.

 
 
Maritime Security Naval Architecture Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1186 sec (8 req/sec)