GOM Well Fire Addressed

Friday, January 07, 2000
Callon Petroleum Co. reported that all equipment and manpower were in place to bring the fire on its South Marsh Island Block 261 well in the Gulf of Mexico under control. Sunday afternoon Callon experienced a natural gas blowout while drilling the No. 2 test well at Block 261, located about 70 miles south of Lafayette, La. At the time of the incident all personnel were safely evacuated from R & B Falcon Corp. R & B Falcon/Cliffs Drilling Rig No. 153, which was drilling the well. Adverse weather prevented re-boarding of the drilling rig until Wednesday.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

POSH Bags Shell FLNG Contract

Singapore’s offshore marine services provider PACC Offshore Services Holdings Ltd. (POSH) has been awarded a contract to support Shell’s Prelude floating liquefied

US Oil Drillers Cut Rigs after 3 Weeks of Additions

U.S. oil drillers cut rigs this week for a 20th week this year after three weeks of additions, according to a closely followed report on Friday, as crude prices

Subsea 7 Announces PLSV Swap off Brazil

Subsea 7 S.A. said it has reached an agreement with Petrobras to substitute a pipelay support vessel (PLSV) working off Brazil.   The agreement will see the Subsea-7-owned

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0741 sec (13 req/sec)