GOM Well Fire Addressed

Friday, January 07, 2000
Callon Petroleum Co. reported that all equipment and manpower were in place to bring the fire on its South Marsh Island Block 261 well in the Gulf of Mexico under control. Sunday afternoon Callon experienced a natural gas blowout while drilling the No. 2 test well at Block 261, located about 70 miles south of Lafayette, La. At the time of the incident all personnel were safely evacuated from R & B Falcon Corp. R & B Falcon/Cliffs Drilling Rig No. 153, which was drilling the well. Adverse weather prevented re-boarding of the drilling rig until Wednesday.
Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Strategic Marine Delivers ‘Triple First’ StratCat

Strategic Marine, a leading specialist shipbuilder and member of the TriYards Group, has delivered a world’s first to European windfarm service sector operator, Njord Offshore.

China Unveils Action Plan on Maritime Silk Road

China has unveiled the principles, framework, and cooperation priorities and mechanisms in its Maritime Silk Road initiative in a bid to enhance regional connectivity

JV Wins $2bln Freeport LNG Contract in US

A joint venture (JV) between CB&I, Chiyoda International and Zachry Industrial has won a contract worth over $2bn from FLNG Liquefaction 3 for a liquefied natural

 
 
Maritime Contracts Maritime Security Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1375 sec (7 req/sec)