GOM Well Fire Addressed

Friday, January 07, 2000
Callon Petroleum Co. reported that all equipment and manpower were in place to bring the fire on its South Marsh Island Block 261 well in the Gulf of Mexico under control. Sunday afternoon Callon experienced a natural gas blowout while drilling the No. 2 test well at Block 261, located about 70 miles south of Lafayette, La. At the time of the incident all personnel were safely evacuated from R & B Falcon Corp. R & B Falcon/Cliffs Drilling Rig No. 153, which was drilling the well. Adverse weather prevented re-boarding of the drilling rig until Wednesday.
Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

AFBO to Provide Security in Arctic Waters

State of the Arctic Council to establish a new mechanism to strengthen operational cooperation and coordination of activities at sea. This is dictated by the

First Damen Twin Axe Workboat for Middle East

Damen Shipyards Group has delivered a Damen Fast Crew Supplier (FCS) 2610 workboat, named AOS SWIFT for the Atlantic Maritime Group on 20 August 2015. This is

Harkand: Expanding the Fleet, Growing a Global Business

International inspection, repair and maintenance (IRM) company Harkand aims to be a $1 billion company. MR’s Tom Mulligan recently met with John Reed, the company’s CEO,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.9353 sec (1 req/sec)