Goodearth Maritime to Build Shipyard

Monday, November 20, 2006
According to reports, Goodearth Maritime is planning to build a shipyard on the east coast of the country with Korea Maritime Consultants Limited (Komac). The first phase of the project is expected to cost about $250 million, and will see tankers as large as 100,000 deadweight tons being built. Phase two will accommodate supertanker orders and the new yard could build up to 12 Very Large Crude Carriers (VLCCs) a year, reports said.

The yard, along with Komac, a private South Korean company of naval architects and marine engineers -- which is expected to build tankers, bulk vessels and chemical carriers -- is slated to start construction in about 15 months. Komac provides a full range of professional services including ship design, construction supervision, and technical and management consultancy services to shipbuilders and ship owners in more than 23 countries. Source: Reuters

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

RS Class New Ships for the Caspian Sea

Russian Maritime Register of Shipping (RS) has signed a contract with Baku Shipyard LLC for the construction of three 38М high speed crewboats (designer - SHIPTECH,

North Sea Atlantic Joins the Technip fleet

On Saturday July 26, 2014, a ceremony was held in Bergen to officially name the latest new subsea construction vessel to join the Technip fleet, the North Sea Atlantic.

New Australian Navy Submarines to be Japan Built?

Australia should discuss building its next-generation fleet of submarines overseas, the Department of Defence said on Monday, a shift that could open the door to

Offshore

Offshore Installation at Lerwick

A large steel oil storage tank to be installed west of Shetland as part of Premier’s development of the Solan field has arrived in Lerwick onboard a heavy-transport vessel Xiang Yun Kou,

Wagenbourg New Crane for Oil, Gas, Energy Sector

Wagenborg Nedlift has expanded her crane fleet with a brand new 700 tonnes mobile crane. With this crane the fleet is significantly strengthened. Equipped with

Study: An Arctic Oil Well Blowout Could Spread More Than 1,000km

Oil from a spill or oil well blowout in the Arctic waters of Canada's Beaufort Sea could easily become trapped in sea ice and potentially spread more than 1,000 kilometres to the west coast of Alaska,

 
 
Maritime Security Maritime Standards Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1486 sec (7 req/sec)