Government Ships Spend Time At Cascade

Wednesday, May 08, 2002
This past winter, Portland, Ore.-based Cascade General saw the arrival of several government-owned vessels from homeports such as Southern California and Alaska. The 418-ft. (127.4-m) M.V. Columbia, owned by Alaska Marine Highways was at Cascade for most of the winter for modernization of its public areas in the restaurant and café, refurbishment of the car-deck doors, installation of a laundry elevator from the car to cabin deck, and replacement of all windows in the vessel's solarium. The 30-year-old vessel will undergo an upgrade consisting of new furnishings and food-serving facilities, as well as replacement of galley equipment. Columbia, which carries 941 passengers and 174 cars on the Inland Passage from Bellingham, Wash. to Skagway, Alaska, operates during the summer months. Cascade has worked on the entire Alaska fleet, including the company's newest, the 382-ft. (116.4-m) M.V. Kennicott, which was launched in 1998. The first of two naval support ships to call on Cascade, was the 668-ft. (203.6-m) MarAd self-unloading containership SS Grand Canyon. The vessel, which is based in Alameda, Calif., was lifted into the yard's Drydock 3 for blasting and coating. The tail shaft and propeller were removed for a complete inspection and repairs were also made to the hatches. SS Grand Canyon was followed by San Diego-based USNS Guadeloupe, which is a 677-ft. (206.3-m) MSC oiler that is the second in its class to receive a new stern-seal system at the yard. The upgrade consisted of the opening of the stern tubes for installation of new piping. Shafts were pulled and the C.P. propellers were dismantled for inspection during this period. The vessel's bottom was also blasted and coated, while a 10 x 70-ft. (3 x 21.3-m) section of sideshell was renewed. A frequent guest at Cascade's drydock paid another visit this past winter — The Corps of Engineers 350-ft. (106.6-m) dredge vessel Essayons. The vessel, whose territory includes the U.S. West Coast, including Alaska and Hawaii, spent 56 days at the shipyard. Its entire hopper area was staged for a complete steel survey after it was determined that all deteriorated steel be destroyed or replaced. Planning has already commenced in the yard for the vessel's next visit this fall when its entire dredge control system will be replaced with innovative computerized equipment.
Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Exhaust Gas Scrubber Guide Updated

An updated version of the “Exhaust Gas Cleaning Systems Selection Guide” is now available, the U.S. Maritime Administration (MARAD) announced today.   Developed

Oman Drydock Company Expands Rapidly

Oman Drydock Company (ODC) is growing fast. In January, the yard hit an important milestone - its 300th drydocking. Harnessing the power of its new $1.8 billion, 1.

NASSCO Invests in Facilities, Equipment and People

General Dynamics NASSCO has invested several hundred million in capital projects as part of its efforts to increase efficiencies via  modular shipbuilding, including:

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Offshore Oil Port Authority Salvage Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2958 sec (3 req/sec)