Grandweld, New Shipbuilding Contracts

Wednesday, June 24, 2009

According to a June 23 report from Seatrade, Grandweld recently held keel laying ceremonies for two 118 ft utility vessels and one 134.5 ft crewboat for repeat customer Humaid Badir Marine Shipping Est., a UAE based fleet operator. The three vessel order is said to signal a strong 2009/10 order book for the Dubai based shipbuilding, ship repair and conversion yard, part of GMMOS Group.

(Source: Seatrade)

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

ClassNK Head Attends KOTC Delivery Ceremony

Noboru Ueda, Chairman and President of ClassNK attended the delivery ceremony for the M/T Al Yarmouk, constructed at Daewoo Shipbuilding & Marine Engineering Co.

Vard Orders Parat Electric Steam & Hot Water Boilers

During the last month, PARAT Halvorsen AS has collected four new boiler plant orders from the Vard Group and their multipurpose platform ships of Vard 1 08 design.

N-KOM Lays Keel for Qatar’s First Liftboat

Nakilat-Keppel Offshore & Marine (N-KOM) has achieved another milestone with the keel laying of its first liftboat newbuild project, awarded in July 2014 by long-time

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1395 sec (7 req/sec)