Great Lakes Shipyard Reconstructs Put-In-Bay

Thursday, April 29, 2010
Photo courtesy The Great Lakes Towing Company

Great Lakes Shipyard, a division of The Great Lakes Group, has completed all work required under contract with Miller Boat Line, Put-in-Bay, Ohio, to fabricate and install a new 40-ft mid-body extension in the passenger/vehicle ferry Put-in-Bay. The contract was awarded on August 17, 2009, and all work was completed at Great Lakes Shipyard facilities on the South Bank of the Old River Channel, on Cleveland's Cuyahoga River.

What started out as a straight forward mid-body extension project grew into a complete rebuild, including replacement of the main engines with new CAT C18 diesels. The mid-body extension of the Put-in-Bay increased the length of the vessel from 96-ft to 136-ft overall and nearly doubled its carrying capacity. The project also included the installation of new rudders, a new steering system, new main engine keel cooling system, generator overhauls and new propellers.

Miller Boat Line’s fleet includes three additional all-steel passenger/vehicle ferries, each approximately 96-ft in length, which run on Lake Erie from Catawba to the islands of Put-in-Bay (South Bass Island) and Middle Bass Island, Ohio.

www.thegreatlakesgroup.com

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Passenger Vessels

Royal Caribbean Ship Thrashed by Storm Returns on Wednesday

A Royal Caribbean cruise ship forced to turn back early after being battered by an Atlantic storm was expected to return to its New Jersey port at 9 p.m. on Wednesday (0200 GMT Thursday),

Meyer Turku Lays Keel of Tallink’s LNG Ferry

The keel of the Tallink’s new LNG-powered fast ferry Megastar was laid at the Meyer Turku shipyard   The hull assembly of Tallink’s new fast ferry Megastar started

PVA Elects 2016 Leadership

During the PVA Annual Convention at MariTrends 2016 held January 23-26 in Crystal City, Va., members of the Passenger Vessel Association (PVA) elected Margo Marks of Beaver Island Boat Company,

 
 
Maritime Security Maritime Standards Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0735 sec (14 req/sec)