Grimaldi Orders Four From Fincantieri

Wednesday, March 23, 2005
Grimaldi Group Naples, through its companies Industria Armamento Meridionale (INARME) and Grimaldi Compagnia di Navigazione (GRINAVI) has ordered four ships from Fincantieri, with an option for a further two. The overall value of the order, excluding options, is approximately 360 million Euros.

INARME has ordered two cruise ferries for delivery in 2007 and GRINAVI two RoRo-pax ships, i.e. vessels to transport passengers, trailers and vehicles, for delivery in 2008. The Group also has an option for a further two ships for delivery in 2009. Grimaldi Group Naples and Fincantieri are linked by a long-standing tradition of cooperation. To this regard, Guido Grimaldi, Chairman of the Group, pointed out that, since 1987, Grimaldi has ordered 23 vessels from Fincantieri for wheeled cargo thus contributing to ensuring continuity of workload and employment to various Fincantieri shipyards, in particular in the South of Italy.

The main characteristics of the cruise ferries are: length 190 meters, maximum deadweight 7,500 tonnes, passenger capacity 2,000, passenger cabins 400, lane meters 2,600, maximum speed 28 knots.

The main characteristics of the RoRo-Pax vessels are: length 180 meters, maximum deadweight 7,500 tonnes, passenger capacity 1000, passenger cabins 100, lane meters 2,700, maximum speed 25 knots.

However, the agreement between Fincantieri and Grimaldi goes well beyond this substantial order. Indeed, the two companies intend to set up a fruitful cooperation aimed at developing new designs within the framework of which Fincantieri is set to become Grimaldi Group’s preferred shipyard. Within this perspective the companies are considering setting up joint programs to enable Grimaldi to maximize its operating and strategic targets and to enable Fincantieri – also by adopting new technologies and including new suppliers and products - to reach design and process economies. Moreover, Grimaldi is set to draw on the maintenance and repair services of Fincantieri’s shipyard at Palermo and of other shipyards, in Italy or abroad, which are able to work in synergy with the yard in Sicily.

With regard to the new orders, the Chairman of Grimaldi Group Naples, Guido Grimaldi, said “The new order placed with Fincantieri is part of the plan to upgrade and expand our fleet aimed at developing the concept of “highways of the sea” which our Group has made operational in recent years in the Mediterranean.

Technologically cutting edge and provided with a full range of comforts, the new ships ordered will enable our Group to offer our customers an increasingly sophisticated range of services”.

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Shipping Turns From Banks to Equity Markets for Cash

Shipping companies are turning to equity markets to fill a growing funding gap, betting that investors hungry for decent returns will provide capital to a sector

Keel-Laid for Navy's 10th LCS at Austal Yard

The Navy and Austal USA held a keel-laying ceremony for the future 'USS Gabrielle Giffords', the Navy's 10th littoral combat ship (LCS), in Mobile, Ala., informs

Havyard to Build Hybrid Battery Arctic PSV

Norway's Havyard says it has signed a contract for the construction of a Havyard 833 WE ICE platform supply vessel with Fafnir Offshore HF. The vessel is to be

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Port Authority Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0721 sec (14 req/sec)